-
Reference:
2024/3922
-
Question by:
Zack Polanski
-
Meeting date:
21 November 2024
In the Transport for London (TfL) press release on their tender for purpose-build solar farms to connect with private wire into the TfL network, it says that: “In the longer term, private wire schemes could generate financial savings, bypassing some of the costs associated with delivery of power through the National Grid.” What benefit would stable energy costs from a larger supply of energy from renewable energy provide to TfL, and what longer term changes would be necessary to generate financial savings from private wire?