Skip to main content
Mayor of London logo London Assembly logo
Home

Publication of review of flood risks

  • Reference: 2021/3275
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Will you publish the 2016 London Underground Comprehensive Review of Flood Risks, and subsequent work on surface water flooding by Transport for London (TfL), and if not will you explain what prevents you from sharing it?

Speed limits on Thames crossings

  • Reference: 2021/3274
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
What are the current speed limits for each road bridge across the Thames, and when did they last change?

Analysis of walking and cycling crossings of Thames

  • Reference: 2021/3273
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Can you share the most recent assessment by Transport for London (TFL) of gaps between crossings of the Thames for people walking and cycling?

Lower Thames Crossing

  • Reference: 2021/3272
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
What involvement has Transport for London (TfL) had in the proposed Lower Thames Crossing, which is now budgeted at £6.3bn, and are you supporting this proposed new motorway?

Action to reach Vision Zero goal (2)

  • Reference: 2021/3271
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Thank you for your answer to my question 2021/1473, has Transport for London (TfL) now drafted the plan to which you referred which would accelerate work on vision zero and improve safety at the most dangerous junctions?

TfL and Network Rail engineering work over the Christmas period

  • Reference: 2021/3270
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Please provide an update on the negotiations between Network Rail and TfL over engineering work on rail routes to Heathrow airport? Can you provide an assurance that Tube and rail routes will not be simultaneously out of operation on Boxing Day? Please also provide an update on the specific provision that will be in place for people with accessibility needs.

Closure of the Bank branch of the Northern Line

  • Reference: 2021/3269
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Following the closure of the Bank branch of the Northern line, from Kennington to Moorgate for 17 weeks from January 2022 to facilitate the final stages of work on Bank station, what alterations will TfL be undertaking to bus routes?

Holborn Gyratory

  • Reference: 2021/3268
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Please provide an update on (a) TfL’s investigation into the recent fatality at Holborn Gyratrory, and (b) the exact timescale for vital improvements to be made at this junction.

Publication of up-to-date information on the risk of catching Covid on the train

  • Reference: 2021/3267
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Do you support the call by London Travelwatch for RSSB (the Rail Safety and Standards Board) to publish in full the most recent information it holds on the risk of catching Covid by train? Please also set out whether you entered into any correspondence in support of this information being publicly available.

GTR services

  • Reference: 2021/3266
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Following the welcome decision to include Thameslink on the Tube map will you take steps to remind GTR that its timetable should not be savagely cut as has happened during August, where its reduction in its timetable service was far greater than the reduced service offered by other train operators.
Subscribe to