Skip to main content
Mayor of London logo London Assembly logo
Home

Northern Line Extension Noise

  • Reference: 2021/3279
  • Question by: Marina Ahmad
  • Meeting date: 09 September 2021
Residents are reporting high levels of noise due to the work on the Northern Line Extension. What actions are being taken to mitigate this disruption?

Question and Answer Session: Transport for London

  • Reference: 2021/3277
  • Question by: Andrew Boff
  • Meeting date: 02 September 2021
How is Transport for London (TfL) supporting London’s recovery from the pandemic, and what are its greatest priorities and challenges over the longer-term?

Transport infrastructure affected by flooding

  • Reference: 2021/3276
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Since your answer to 2019/19667, there have been several new occurrences of flooding to infrastructure operated by Transport for London (TfL). Can you list for the last two years since that answer: a) what stations or other transport infrastructure were closed due to flooding, b) how long they were closed, and c) the dates they were closed?

Publication of review of flood risks

  • Reference: 2021/3275
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Will you publish the 2016 London Underground Comprehensive Review of Flood Risks, and subsequent work on surface water flooding by Transport for London (TfL), and if not will you explain what prevents you from sharing it?

Speed limits on Thames crossings

  • Reference: 2021/3274
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
What are the current speed limits for each road bridge across the Thames, and when did they last change?

Analysis of walking and cycling crossings of Thames

  • Reference: 2021/3273
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Can you share the most recent assessment by Transport for London (TFL) of gaps between crossings of the Thames for people walking and cycling?

Lower Thames Crossing

  • Reference: 2021/3272
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
What involvement has Transport for London (TfL) had in the proposed Lower Thames Crossing, which is now budgeted at £6.3bn, and are you supporting this proposed new motorway?

Action to reach Vision Zero goal (2)

  • Reference: 2021/3271
  • Question by: Siân Berry
  • Meeting date: 02 September 2021
Thank you for your answer to my question 2021/1473, has Transport for London (TfL) now drafted the plan to which you referred which would accelerate work on vision zero and improve safety at the most dangerous junctions?

TfL and Network Rail engineering work over the Christmas period

  • Reference: 2021/3270
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Please provide an update on the negotiations between Network Rail and TfL over engineering work on rail routes to Heathrow airport? Can you provide an assurance that Tube and rail routes will not be simultaneously out of operation on Boxing Day? Please also provide an update on the specific provision that will be in place for people with accessibility needs.

Closure of the Bank branch of the Northern Line

  • Reference: 2021/3269
  • Question by: Caroline Pidgeon
  • Meeting date: 02 September 2021
Following the closure of the Bank branch of the Northern line, from Kennington to Moorgate for 17 weeks from January 2022 to facilitate the final stages of work on Bank station, what alterations will TfL be undertaking to bus routes?
Subscribe to