384 bus (1)

  • Reference: 2021/4149
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
The recent review into the performance of the new 384 bus route seems to indicate that it is feasible for alternative arrangements to be made to accommodate a bus route back around the Bevan Estate near Cockfosters. Will you press for one of these options to be taken up by TfL to ensure that the residents on that estate have access to bus services? Some parts of the estate are well above the minimum distances they should be from a bus service.

Tube Noise (5)

  • Reference: 2021/4148
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Has an evidence-based view been undertaken on the feasibility of replacing concrete sleepers with wooden sleepers (reverting to what was in place prior to the installation of concrete sleepers) at hotspots on the network where the introduction of concrete sleepers has created excessive (over 40 decibels) residential noise disturbance?

Tube Noise (4)

  • Reference: 2021/4147
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Is there a list of any locations on the Tube and Overground network where alternative (not PVs) rail noise and vibration dampening devices or measures have been installed - indicating the month and year of installation?

Tube Noise (3)

  • Reference: 2021/4146
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Is there a list of all the locations on the Tube and Overground network where PVs have been installed, indicating the month and year of installation - and, in cases where those PVs have been removed, when that occurred and the reason (if known) for removal?

Tube Noise (2)

  • Reference: 2021/4145
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Could you please provide an update on any tests or trials underway (anywhere on the Tube or Overground network) that apply dampening with wooden sleepers - in particular, what do the results show and when can any of these solutions be implemented at other locations on the network?

Tube Noise (1)

  • Reference: 2021/4144
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Please provide an update on any tests or trials underway (anywhere on the Tube or Overground network) that use an alternative dampening method to Pandrol Vanguards (PVs) - in particular, what did the results (noise and vibration levels) show and when are any of these solutions due to be implemented at other locations on the network?

Mayoral Election voting system

  • Reference: 2021/4143
  • Question by: Anne Clarke
  • Meeting date: 14 October 2021
Did the Government consult you on their plans to change the voting system for the London Mayor to First Past The Post? If so, what was your response? If not, what would your response be?

Green Roofs

  • Reference: 2021/4142
  • Question by: Elly Baker
  • Meeting date: 14 October 2021
Following the re-opening of Whitechapel station, complete with a green roof, what plans, if any, do you have to install green roofs on other TfL buildings?

20 MPH

  • Reference: 2021/4141
  • Question by: Elly Baker
  • Meeting date: 14 October 2021
Following question 2021/1473 can you provide the location of the 140km of TfL roads where 20MPH will be introduced?

Accessible Tube Network

  • Reference: 2021/4140
  • Question by: Elly Baker
  • Meeting date: 14 October 2021
What estimate, if any, has TfL made of the cost to get to 50% of all tube stations being fully accessible?