Cost of adding walking and cycling facilities to Silvertown Road Tunnel (1)

  • Reference: 2021/4094
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
During the preliminary case for the scheme for Silvertown Road Tunnel a figure of £70 million was quoted for the addition of walking and cycling facilities. Do you still agree that this is all it would cost to add a permanent, 24-hour accessible link for walking and cycling to Silvertown Road Tunnel, and how does it compare in terms of capacity, and trip time and cost to the proposed bus service?

Embodied carbon in construction

  • Reference: 2021/4093
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
The recent report from the National Engineering Policy Centre and Royal Academy of Engineering, Decarbonising Construction: building a new net zero industry, includes this recommendation: “The construction sector should adopt the same carbon emission reduction targets as the national targets of 68 per cent and 78 per cent by 2030 and 2035 respectively, compared to 1990 levels. These recommended percentage reductions should include embodied carbon of built infrastructure, including that of imported construction materials, not just the scope of emissions included in the UK carbon budget.” Will you consider rewriting the Circular Economy Statements Guide advising developers how can they...

Kilburn Square Estate response

  • Reference: 2021/4092
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
Residents of Kilburn Square Co-Op have been informed in a letter from Brent Council that their proposal for developing the Kilburn Square estate will now be: “adapted in collaboration with residents.” The letter also says: “We have also received feedback on the current scheme from […], the Mayor of London’s office.” Will you publish this correspondence?

Shading of existing solar installations

  • Reference: 2021/4091
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
A constituent has contacted me regarding the problem of planning applications that would cause shading on existing neighbouring solar panels. It appears there is no guidance in the London Plan – or local authority Local Plans – to consider these impacts in planning , in contrast to the ‘agent of change’ principles you have introduced for noise. Will you bring in such a policy to help Londoners and community organisations making investments in solar panels?

Loss of green spaces in housing estates

  • Reference: 2021/4090
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
The London Green Spaces Commission Report states: “we need to recognise that parks are part of a wider network of public realm, which includes spaces such as civic squares, streets and green areas in housing estates.” What are you doing to protect residents from infill proposals that remove green space, playgrounds and sports facilities?

Estate ballot process review (2)

  • Reference: 2021/4089
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
You have not provided clear guidelines on the process of resident ballots on estates facing demolition plans, leaving open the potential for unfair conduct by landlords. What plans do you have to provide guidelines to ensure, for example fair publicity and secret voting in every ballot?

Estate ballot process review (1)

  • Reference: 2021/4088
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
In your 2021 manifesto you committed to reviewing how your policy for ballots before major estate regeneration plans get funding is working. As part of this review will you be asking for feedback from residents on all estates that have held ballots so far, including Love Lane in Tottenham, where complaints have been made about landlord pressure, lack of secrecy over ballots and other intimidatory practices, and Gilbeys Yard in Camden, where the ballot is planned to being re-run without significant changes being made to the landlord offer?

PLACE update (2)

  • Reference: 2021/4087
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
Thank you for your answer to my question 2021/0462. Could you: a) update me on plans for installation of PLACE (Pan-London Accommodation Collaborative Enterprise) homes in Tower Hamlets, b) tell me how many of the 200 precision-manufactured homes have been installed and where, and c) tell me what plans there are, if any, to expand on the number of PLACE homes in London?

Green Homes Grant Local Authority Delivery scheme

  • Reference: 2021/4086
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
With regard to the Green Homes Grant Local Authority Delivery scheme (MD2775) can you provide me with details of what improvements were made by the five social landlords to improve energy efficiency: how the work was commissioned and who carried it out; what data is being collated to examine the effectiveness of the measures and whether they both save the tenants money on fuel bills and cut carbon emissions?

Gypsy and Traveller sites

  • Reference: 2021/4085
  • Question by: Siân Berry
  • Meeting date: 14 October 2021
You have stated that capital funding is being made available through the Mayor’s Affordable Homes Programme to remodel existing Gypsy and Traveller sites and pitches in need of refurbishment or build new sites. Could you outline, for both the Affordable Homes Programme 2016-23 and 2021-26, how much funding has been allocated to date, the number of sites by local authority, and whether the funding was for refurbishment or new build?