Skip to main content
Mayor of London logo London Assembly logo
Home

Severe Weather Emergency Protocol (1)

  • Reference: 2025/4752
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
You fund a pan-London ‘overflow’ service for Severe Weather Emergency Protocol (SWEP) spaces. How many additional beds does this provide, and will capacity increase given rising rough sleeping numbers?

Bus capacity (2)

  • Reference: 2025/4751
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
When making changes to bus routes, does the EqIA look at the capacity on the network of space for wheelchairs and buggies, so we can be sure that wheelchair users and parents will not be disadvantaged by any changes?

Bus capacity (1)

  • Reference: 2025/4750
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
What data, if any, does TfL hold about the frequency that bus space taken up by wheelchairs and buggies is at capacity and so no more wheelchairs or buggies can be allowed to board? Does TfL record when passengers are stopped from boarding due to the bus being at capacity?

Driver Instructions on Waiting Times for Passengers with Buggies

  • Reference: 2025/4749
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Are bus drivers instructed on how long they should wait after parents with buggies board via the rear doors, to ensure they have sufficient time to reach the front and pay before the bus moves off, thereby reducing the risk of trips or injuries?

Breakdown of rail-grinding meterage between Highbury and Kings Cross

  • Reference: 2025/4748
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Please provide a breakdown of the rail-grinding meterage completed for general maintenance compared with that carried out specifically to reduce Tube noise between Highbury and Kings Cross.

Funding for Rail Grinding in the last 5 years

  • Reference: 2025/4747
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Why was funding for rail grinding in 2023–24 lower than in 2019–20? Please provide a breakdown of the funding for every year from 19/20 to 25/26.

Funding for Rail Grinding in 2025

  • Reference: 2025/4746
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
How much funding was allocated for rail grinding between Highbury and Kings Cross in 2025?

Archway Campus Application Call-In Update

  • Reference: 2025/4745
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Can the Mayor provide an update on the call-in for the Archway Campus site, including when the public hearing is expected to take place?

Traffic-calming measures on the A12 in Hackney Wick

  • Reference: 2025/4744
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Following TfL's visit in 2023, what progress has been made on developing traffic-calming measures on the A12 in Hackney Wick? A consultation was suggested for 2024 — can you provide an update on its status?

Update on TfL funding for the Stoke Newington Gyratory in 2025

  • Reference: 2025/4743
  • Question by: Sem Moema
  • Meeting date: 18 December 2025
Can you provide an update on TfL’s funding plans for the Stoke Newington Gyratory in 2025, including when the public consultation is expected to take place?
Subscribe to