Skip to main content
Mayor of London logo London Assembly logo
Home

London Power (2)

  • Reference: 2025/0021
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
How many customers does London Power have? Can this be broken down by year since 2017?

London Power (1)

  • Reference: 2025/0020
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
How much total investment from the GLA has been invested into London Power?

Boiler Upgrade Scheme (5)

  • Reference: 2025/0019
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
In your Environment Strategy, there is a flow diagram on page 215 that has ‘city-wide deployment of low carbon heating systems eg heat pumps’ with the date ‘2030s’, this appears to be at odds with your target of 2.2 million heat pumps to be installed by 2030. Which target are you aiming for?

Boiler Upgrade Scheme (4)

  • Reference: 2025/0018
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
What support do you require from Government to reach a target of 2.2 million heat pump installations?

Boiler Upgrade Scheme (3)

  • Reference: 2025/0017
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
There is a target of 2.2 million heat pumps needed to reach the Mayor's Net Zero goal, is this achievable and realistic?

Boiler Upgrade Scheme (2)

  • Reference: 2025/0016
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
How many upgrades have taken place, and can this be broken down by borough?

Boiler Upgrade Scheme (1)

  • Reference: 2025/0015
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
How many grant applications and payments have been made since 23 May 2022 when the scheme opened?

Boiler Scrappage Scheme (6)

  • Reference: 2025/0014
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
In MD2172, one of the aims of the Scrappage Scheme was ‘acting as a catalyst to spur on additional energy efficiency improvements (e.g. heating controls and insulation)’. Has the scheme spurred on additional energy efficiency improvements, and how it this measured?

Boiler Scrappage Scheme (5)

  • Reference: 2025/0013
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
In MD2172, one of the aims of the Scrappage Scheme was ‘saving up to £7m per year off business’ fuel bills which will significantly help reduce overheads for SMEs and other potential local enterprises’. How much has this scheme saved SMEs in London and how was this calculated?

Boiler Scrappage Scheme (4)

  • Reference: 2025/0012
  • Question by: Thomas Turrell
  • Meeting date: 16 January 2025
In MD2172, one of the aims of the Scrappage Scheme was ‘delivering non-domestic retrofits. Replacing around 900 commercial boilers across London’. How many retrofits were carried out in this scheme, and can this be broken down per year?
Subscribe to