Skip to main content
Mayor of London logo London Assembly logo
Home

4. Growing London’s economy in a way that benefits all

Draft London Plan (2026)

Key information

Publication type: The London Plan

Publication status: Draft

Publication date:

4.1    The London Growth Plan sets out the growth ambitions for London as a global city including increased productivity; inclusion; green growth; and increasing services exports. A range of business space and infrastructure is required to create the conditions necessary to meet these ambitions for London; this will involve growth, adaptation, innovation and improvements53.

4.2    The labour market projections suggest the largest growth employment sectors will continue to be in professional, scientific, technical and real estate activities and therefore London will continue to need prime office space that meets occupier demands in highly accessible locations. There is also identified demand for retail, other Class E and research and life sciences, and other ‘frontier innovation’ space. New non-residential floorspace will need to be flexible and adaptable to meet the variety of commercial space requirements across London.

4.3    While London has seen a decline in industrial space due to a range of factors, including the decline in manufacturing and the demand for housing, the evidence shows there is an increasing demand for industrial land. This reflects an increasing population, continued changes in the way we shop (with associated logistics requirements), and the need for infrastructure to support a growing economy. Given the limited supply of land to meet all our housing and economic needs, as well as the infrastructure to underpin this, the policy approach needs to balance the different demands; direct them to the most appropriate locations; and minimise adverse impacts.

4.4    London’s wealth of cultural and sporting venues – and the experience economy more widely – contributes significantly to London’s social and cultural value and identity as well as to the visitor economy. The importance of culture is specifically recognised nationally including through the City of Culture programme. Culture and the creative industries contribute around £50 billion to London's economy every year and account for one in seven jobs in the capital. The night-time economy also plays a crucial role in this. However, London’s cultural venues and creative spaces face a range of threats (including the loss of premises to alternative uses such as housing and constraints on operation) and affordability concerns. It is important to retain these uses and provide new spaces and facilities where possible. It is also important to enable ongoing operation of existing facilities and manage impacts of new development, including through the application of agent of change policy and the effective interaction between licensing and planning policy regimes.

4.5    Business costs including rents are particularly high in London. Affordable workspace is needed to support new and emerging businesses and industries as well as other uses that contribute to the vibrancy of London as a global city of commerce and culture and as a tourist destination. Given the growth in availability of secondary commercial stock, this Plan has a new approach to enable off-site provision or payments in lieu.

4.6    While London is the engine of the UK economy, the benefits of economic success are not shared evenly across the capital. This means that some Londoners find it harder to gain genuine access to work than others. For those in work, finding good-quality jobs that use their skills fully can also be an issue. At the same time, London is facing acute workforce shortages across the construction and built environment industries, which is a barrier to meeting London’s growth needs. The Plan seeks to secure good quality employment opportunities for Londoners, including those who are out of work, under-employed or from under-represented groups in the labour market.

4.7    There are a number of infrastructure uses that are important to support London’s continued economic success, but that currently have adverse environmental impacts such as aviation, data centres and logistics. Without proper planning and mitigation requirements, these can have disproportionate impacts. Conversely there is the opportunity to harness their potential while protecting our environment and serving our communities.

4.8    The Environment Strategy sets the objective to maximise local waste sites and ensure that London has sufficient infrastructure to manage all the waste it produces, with a view of becoming net self-sufficient. London is currently 70 per cent self-sufficient; as such, more work over the Plan period is required to achieve this objective. This needs to be done in the most sustainable way including through the proximity principle prioritising reuse, recycling and circular economy needs.

4.9    London also has a growing demand for aggregates, in particular to support construction and therefore the relevant boroughs need to safeguard the sources for these – both land won and marine/imported. This also requires a robust approach to protecting wharves to enable the long-term efficient transport of these materials as well as waste and other goods, making best use of the sustainable transport opportunity presented by the Thames. A precautionary approach to possible proposals for hydraulic fracturing (‘fracking’) is also considered necessary, until a clearer national position is in place.

4.10    The sub-key diagram illustrates the Growing London’s Economy policies spatially where relevant, but should be read in conjunction with the key diagrams and the Infrastructure sub key diagram in chapter 2 and the Places sub-key diagram in chapter 6.

Diagram illustrating key spatial aspects of the Growing London's Economy policies
Figure -

4.1:Economy sub key diagram

Key for Figure 6.2 Strategic CAZ Diagram
Figure -

Key for figure 4.1

General Map Symbols
Town Centres Metropolitan

Symbol: Solid square
Colour: Dark pink / magenta

Strategic Road Network

Symbol: Line
Colour: Light grey

Rail Freight

Symbol: Small circular marker
Colour: Pale pink

Airport

Symbol: Aircraft silhouette
Colour: Black

Stratford International

Symbol: Five-point star
Colour: Dark blue-grey

Safeguarded Wharves

Symbol: Solid square
Colour: Dark blue-grey

Strategic Industrial Location

Symbol: Hollow circle
Colour: Purple outline

Industrial Property Market Areas

Represented by coloured blocks:

Lea Valley – pale cream / light yellow
Thames Gateway – light grey
Wandle Valley – pale pink
Park Royal / A40 / Heathrow – pale green-grey
Central Services Area – light pink

Strategic Economic Corridors

Represented by dotted lines:

UK Innovation Corridor – light blue
Thames Estuary Production Corridor – orange
West Tech Corridor – pale brown

BLG: Central Activities Zone (CAZ) including Northern Isle of Dogs (NIOD)

Symbol: White square with a red outline and a diagonal red stripe.

International Centres

Represented by a red circular marker containing a white number.

1 – West End
2 – Knightsbridge

BLG: Transformational Gateways

Represented by a pink circular marker containing a white number.

3 – Paddington
4 – Euston
5 – Waterloo
6 – Liverpool Street
7 – Victoria

BLG: Brownfield First Opportunity Areas (BFOAs)

Represented by a circular symbol with a blue centre and orange outer ring.

8 – City Fringe / Tech City*
9 – Vauxhall, Nine Elms and Battersea
10 – Elephant and Castle
11 – Isle of Dogs and South Poplar
12 – Lee Valley
13 – Brent Cross / Cricklewood / Staples Corner
20 – Great West Corridor*
21 – White City*
22 – Old Oak / Park Royal
22 – Earl's Court / West Kensington*
23 – Old Kent Road
24 – Canada Water
26 – New Cross – Lewisham – Catford
27 – Greenwich Peninsula
29 – Thamesmead and Abbey Wood
31 – London Riverside
32 – Royal Docks and Beckton Riverside*
34 – Olympic Legacy
36 – Wood Green
37 – Croydon

BFOAs marked with an asterisk are also Strategic Economic Clusters.

BLG: Strategic Economic Clusters

Represented by a diamond symbol with a blue centre and pink surround.

38 – Heathrow Economic Area
39 – London Cancer Hub
40 – Battersea (Ransomes Dock)
41 – Biggin Hill
42 – Chiswick Park
43 – Crystal Palace
44 – Dagenham East
45 – Olympia
46 – Royal National Orthopaedic Hospital
47 – SCI King's College Hospital, Denmark Hill
48 – St George's Hospital
49 – Tottenham
50 – Whitechapel

BLG: Green Belt Industrial Sites

Represented by a circular symbol with a purple centre and green outer ring.

66 – A13 (Rainham Area)
67 – A12 (Romford Area)
68 – A127 (Upminster Area)
69 – M1 (Borehamwood West Area)
70 – M20 (Swanley Area)
71 – M40 (Northolt Area)
72 – M4 (Heathrow Area)
73 – M25 / A10 (Northern Lea Valley Area)
74 – M25 South (South Chessington Area)

BLG: Green Belt Future Candidate Industrial Sites
Standard Candidate Sites

Represented by a circular symbol with a purple centre and green outer ring.

82 – M25 North (Potters Bar Area)
83 – A1 (Borehamwood East Area)

Mixed Residential and Industrial Candidate Site

Represented by a multi-point rosette symbol in blue, green and purple.

84 – Stockley Park** (both residential-led and industrial)

Abbreviations

BLG – Broad Locations for Growth
CAZ – Central Activities Zone
NIOD – Northern Isle of Dogs
BFOA – Brownfield First Opportunity Area

Symbol Summary

Dark pink square: Town Centres Metropolitan
Grey line: Strategic Road Network
Pale pink circle: Rail Freight
Black aircraft: Airport
Dark blue-grey star: Stratford International
Dark blue-grey square: Safeguarded Wharves
Purple outlined circle: Strategic Industrial Location
White square with red border and red diagonal stripe: Central Activities Zone (CAZ)
Red numbered circle: International Centre
Pink numbered circle: Transformational Gateway
Blue circle with orange ring: Brownfield First Opportunity Area
Blue diamond with pink surround: Strategic Economic Cluster
Purple circle with green ring: Green Belt Industrial Site
Blue, green and purple rosette: Mixed-use Future Candidate Industrial Site (Stockley Park)

GLE1 Sufficient and appropriate employment space

  • Policy aim: to provide for the land use and floorspace needs of all sectors of the economy and support delivery of the London Growth Plan
  • Applies to: all local plans, and development that includes or displaces employment floorspace
  • Locations: all

Plan-making

A    Plan-making authorities should set out policies in local plans to meet the diverse land and floorspace requirements for all economic uses by providing for a range of suitable business space of different types, sizes and price-points having regard to the needs of SMEs, larger firms and third sector organisations, and informed by the London Growth Plan and London-wide and local assessments of supply and demand.

Development management

B    Developments for Class E uses should be designed flexibly, wherever possible to accommodate a range of commercial, business and service uses and occupier sizes; and facilitate adaptation to future business and community needs and economic circumstances.

C    Developments for light industrial uses should be designed to meet the needs of a range of occupiers with adequate floor-to-ceiling heights and corridor widths, load-bearing floors, goods lifts and access arrangements.

D    Developments for life sciences laboratory space should incorporate necessary design features and access to utilities, with particular requirements for high-capacity power, water, ventilation, load-bearing floors, higher floor-to-ceiling heights, vibration absorption and high-speed digital connectivity.

E    Planning conditions restricting changes in economic or social infrastructure uses may be used in circumstances where they are justified and necessary such as:

(1)    to maintain a balance of uses appropriate to an area, or
(2)    on sites where other uses in the same use class would not be appropriate, or 
(3)    to safeguard capacity for the intended uses such as social infrastructure, creative workspace or light industrial floorspace.

F    Developments that result in the potential displacement of existing small and independent business uses should either re-provide such space in the development where feasible and appropriate in terms of its type, size and cost, including affordable workspace where this exists on site, and/or work with the borough to ensure that appropriate relocation options are available.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.11    The GLA’s strategic evidence54 identifies demand for offices, research and development, life sciences laboratories, retail, leisure, industrial uses, storage and distribution floorspace, and cultural infrastructure (including nightlife uses).

4.12    To ensure a sufficient and appropriate supply of employment space, local plan-making policies may need to be supported by targeted Article 4 Directions to remove commercial to residential permitted development rights, particularly in locations such as the CAZ, NIOD, town centres, high streets and industrial areas. Article 4 Directions should sit alongside a clear and positive route through planning permission for housing delivery in the Mixed CAZ (see PV2 Central Activities Zone (CAZ)) and the NIOD, and in town centres and high streets.

4.13    The design, type, and level of fit-out of commercial uses (including those in mixed-use development) should be fit-for-purpose, inclusive and adaptable, with flexible layouts with few columns or risers, be of a suitable depth to accommodate back-of-house functions. This is to support the long-term viability and adaptability of commercial, social spaces and high streets, ensuring their longevity and resilience to changing economic circumstances. The Mayor’s Designing Space for Culture toolkit provides guidance to support the delivery of high-quality, inclusive and effective space to accommodate different types of creative and cultural workspace.

4.14    Planning Use Class E supports a flexible approach to commercial, business and service uses and LPAs should only limit this flexibility through planning conditions where there are sound planning reasons for doing so. Examples of where planning conditions could be justified and necessary to maintain a balance of uses appropriate to an area include restrictive conditions on new (Class E) light industrial or research and development located in a SIL or Locally Significant Industrial Site (LSIS). Conditions may also be appropriate to safeguard provision of health uses, indoor sport and recreation and creative workspace in other locations such as CAZ, town centres and high streets, where they may be vulnerable to loss to other commercial, business and service uses.

Rationale

This policy reflects a number of key considerations:

4.15    Planning has a key role to play in delivering the ambitions set out in the London Growth Plan, particularly by supporting employment generating development and growth sectors including financial, professional and business services and technology, Creative industries and technologies, International education, Frontier innovation including life sciences, and the experience economy.

GLE2 Supply of industrial land

  • Policy aim: to support economic growth by meeting the strategic needs of businesses, services and infrastructure uses in London that rely on industrial land
  • Applies to: all local plans and development proposals for industrial use
  • Locations: all

Plan-making

A    Plan-making authorities should plan positively in local plans to provide for and maintain sufficient industrial capacity to meet strategic needs in the most suitable locations with good freight transport access. These strategic needs include any identified additional need for sui generis uses that depend on industrial land, as well as a strategic benchmark for storage and distribution55 demand within their Property Market Area (PMA), see Table 4.1: Storage and distribution demand benchmarks by PMA56.

B    Plan-making authorities should establish a strategy to meet their needs, drawing on strategic and local evidence, and seeking to re-activate vacant industrial land and re-purpose any arising surplus land in commercial use. They should also collaborate and pool their respective capacities and plan to re-provide capacity in advance of any release elsewhere within their PMA (see PV5 Industrial land supporting housing growth).

C    With reference to the Economy sub-key diagram and Annex G, plan-making authorities should review the boundaries of their existing industrial designations (Strategic Industrial Locations (SIL) and Locally Significant Industrial Sites (LSIS)). Boundary reviews involve both designating additional industrial land (see part D-E) and releasing currently designated industrial land in appropriate locations (see PV5 Industrial land supporting housing growth).

D    Plan-making authorities should proactively designate new SIL and/or LSIS to help meet their strategic and local needs and to compensate for any release elsewhere in the PMA. This should involve considering whether there is undesignated industrial land in industrial use, which could be designated, in particular if the land is in existing storage and distribution use or particularly suitable for storage and distribution.

E    Within the identified industrial BLGs only (see 10-year key diagram), plan-making authorities should progress strategic-scale release of Green Belt land to help meet their strategic needs (see Policy MBUL1 Spatial strategy and Policy PV7 Sustainable enhancement and development of the Green Belt). Released Green Belt for this purpose should be identified as future SIL.

Development management

F    In SIL and LSIS, development for the following uses only should be supported:

(1)    Class B2 uses
(2)    Class B8 uses
(3)    sui generis industrial uses such as waste, aggregates, utilities and sustainable transport infrastructure
(4)    Class Eg(ii) and Eg(iii)

G    Proposals for industrial intensification (see Glossary) should be supported. Intensification is specifically encouraged in appropriate locations where there is:

(1)    potential to make more efficient use of land and suitable yard space for servicing 
(2)    good long-term viability prospects
(3)    good connectivity to strategic freight transport corridors
(4)    acceptability of the required size and massing of buildings
(5)    adequate distance from sensitive uses to avoid negative impacts, and
(6)    existing stock in need of modernisation.

H    Where intensification can only support class Eg(ii) or Eg(iii) uses, development proposals should demonstrate that this would free up industrial capacity to help meet identified strategic needs elsewhere.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.16    The local need for industrial capacity includes space requirements for industrial uses to serve residents and businesses, including those that contribute to locally significant sectors such as those identified in the London Growth Plan.

4.17    Additional need for different sui generis industrial uses can only be determined by the plan-making authority based on local circumstances and key sectors locally as well as strategic demand and opportunities to provide for a range of infrastructure uses. Engagement with infrastructure providers is important, as per policies MBUL4 and MBUL5. For example, land for public transport will be required as network capacity has to grow to meet need. Engagement and agreement with TfL is needed to ensure operations can be carried out effectively.

4.18    Land that benefits from the agglomeration of industrial uses, the potential for 24/7 operations and good connectivity to strategic freight transport corridors (including water and rail) is particularly suitable for industrial designation. Where such land is designated but currently vacant, is occupied by non-industrial uses or otherwise lacks suitable premises and supporting infrastructure, a site allocation may help positively support industrial use. Site allocations also represent a suitable mechanism to facilitate new designations (see policy parts D-E) and intensification opportunities (see policy parts G-H).

4.19    SIL and LSIS focus on accommodating uses that are dependent on industrial land due to the nature and impact of their activities on sensitive uses; the introduction of non-industrial uses in these areas is not supported. The introduction of non-industrial development in SIL and LSIS will be supported only if set out in an adopted or emerging (Regulation 19) Local Plan at the time of publication of this draft Plan and in agreement with the GLA as part of a coordinated masterplanning process. Data centres are covered in Policy GLE3 Data centres; this policy does not apply to them.

4.20    For Class Eg(ii) and Eg(iii) a mechanism to retain the industrial use over time would ensure they can be counted towards meeting industrial need. Potential mechanisms to help ensure that these uses remain in industrial use over time include planning conditions and design requirements that are necessary for industrial operations.

4.21    Local monitoring arrangements are needed to provide a transparent understanding of performance against identified needs and compensation for any release (see PV5 Industrial land supporting housing growth).

4.22    The benchmarks for additional storage and distribution demand in Table 4.1 include shorter-term figures as the basis for monitoring; while plan-making authorities should positively plan for the longer-term figures by ensuring suitable additional capacity in identified broad locations is at least safeguarded as per MBUL1.

Table 4.1: Storage and distribution demand benchmarks by PMA

PMA000 sqm floorspace 2024-36000 sqm floorspace 2024-50Hectare land 2024-36Hectare land 2024-50
Central Services Area32076070140
Thames Gateway33077070140
Lea Valley1102002040
Park Royal / A40 / Heathrow35075080140
Wandle Valley1503303060
Total1,2602,810270520

4.23    The benchmarks are based on evidence (Economic Uses Demand and Supply Study)57, which also includes an indicative borough breakdown. The demand benchmarks assume that increasingly ambitious efficiency savings are realised through, for example operational improvements such as automation, layout optimisation and digital inventory management; increasing floor heights; and industrial intensification in suitable locations (see Part G). This means that proportionately less land will be required for storage and distribution over time, and this can be promoted by plan-making authorities. An Industrial Collaboration Working Group for plan-making authorities will facilitate and coordinate the meeting of needs on a PMA basis, including additional needs that are likely to arise due to industrial release (see PV5 Industrial land supporting housing growth).

4.24    Given the relatively high benchmark for the Central Services Area (CSA), the need to service the international hospitality and leisure sectors and the limited supply of available land for industrial use, plan-making authorities may seek to work with other PMAs to accommodate a proportion of their need. Any such alternative provision should minimise freight vehicle distance to/from the new industrial location, in particular for activities supporting the servicing of the CAZ. Within the CSA, space to accommodate urban logistics hubs is particularly important.

4.25    For land in SIL or LSIS that is currently occupied by non-industrial uses, plan-making authorities could consider:

  • release from industrial designation, where the criteria in Policy PV5 Industrial land supporting housing growth are met
  • retention as SIL or LSIS and repurposing for industrial provision. 

4.26    Individual development proposals for industrial uses in the Green Belt within and outside broad locations for growth are covered in PV7 Sustainable enhancement and development of the Green Belt. 

Rationale

This policy reflects a number of key considerations:

4.27    London lost 18 per cent of its industrial land between 2001 and 2020. As a modern economy, it cannot function without planning for sufficient land to service its residents, businesses and visitors. Many sectors require close and timely access to their supply chain, access to storage for goods and materials and access to their customers. London is too large to be serviced sustainably solely from its periphery or from outside its boundaries.

4.28    There is a range of strategic needs for businesses, services and infrastructure uses in London that rely on industrial land due to the nature and impact of their activities on sensitive uses. SIL and LSIS focus on accommodating such uses. The construction sector, and strategic infrastructure uses such as waste management and public transport in particular are vital to effectively support London’s growth.

4.29    The character of industrial areas varies across London. Industrial spaces are important to keep London innovating by supporting e-commerce, key environmental services, technology start-ups and many of London’s creative talents.

GLE3 Data centres

  • Policy aim: to set strategic criteria in order to meet the need for data centres in suitable locations in London while mitigating disproportionate impacts and delivering benefits for the local community and environment
  • Applies to: development proposals for data centres
  • Locations: all

Plan making

A    Plan-making authorities should pro-actively identify suitable locations in local plans for data centres to meet need, taking into account the following locational criteria:

(1)    Availability of current and projected electricity network and water supply capacity, recognising the requirements to meet local housing, employment and other infrastructure needs
(2)    Opportunities for clustering to support resilience and co-location benefits 
(3)    Local heat recovery opportunities
(4)    Availability of land without compromising the supply to meet local housing needs as well as employment and infrastructure needs that depend on freight transport infrastructure and
(5)    Where relevant, compliance with Habitats Regulations considering potential air quality impacts from back-up generators on Epping Forest Special Area of Conservation (SAC).

B    If no suitable locations can be identified within the boundaries of the plan-making authority, it should:

(1)    first, collaborate with neighbouring authorities within and outside London
(2)    second, seek to identify suitable locations in the grey belt or on the edge of BLGs in the Green Belt, taking into account the criteria in part A.

C    Plan-making authorities should set out, as part of the process of identifying suitable locations, opportunities for data centres to contribute to relevant local benefits. They should also set out appropriate levels of CIL to help mitigate adverse impacts on, and deliver benefits to, affected communities.

Development management

D    Development proposals for data centres in suitable locations should be supported in principle.

E    Development proposals for data centres in other locations should:

(1)    justify the proposed development location and demonstrate mitigation of adverse impacts including on infrastructure capacity needed to support growth in the area
(2)    demonstrate how adverse impacts of electricity connections, in particular congestion and disruption from street works across multiple plan-making authorities will be minimised and mitigated, and
(3)    use grey belt sites or edge of BLGs in the Green Belt only if it can be demonstrated that no suitable brownfield sites are available.

F    All development proposals for data centres should be as clean and sustainable as possible and demonstrate the use of:

(1)    coordinated heat recovery infrastructure that is informed by a waste heat utilisation plan   
(2)    coordinated electricity and water efficiency measures including innovative cooling technologies and    
(3)    where feasible, electricity generation on-site or nearby from renewable energy sources.

G    The approach to back-up power should demonstrate with reference to the latest best practice that:

(1)    testing is minimised during construction and operation of the data centre, taking into account the cumulative impact of other data centres nearby, with appropriate limits secured as part of any planning permission
(2)    the lowest-emission engines and fuels available are used to minimise overall air quality and carbon impacts, with abatement of emissions applying Best Available Techniques and achieving any relevant emissions standards and
(3)    site location, design and testing hours minimise human exposure.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.30    The types and scale of data centres are evolving rapidly and so are their impacts. Data centre operators tend to benefit from clustering, where existing data centres are already established. There is significant uncertainty over the scale of demand for data centres, but London’s Data Centre Future Growth Forecasts and Strategic Insights study58 provides relevant evidence for plan-making authorities to consider, alongside an expected National Policy Statement on data centres and a Data Centre Strategy, as well as up-to-date information from the NESO, the National Grid and the Distribution Network Operators.

4.31    Plan-making authorities will monitor the scale and cumulative impacts of multiple data centre developments within suitable locations and keep re-assessing them based on the criteria set out in Part A.

4.32    LAEPs set out the decarbonisation pathway for an area, including current and projected availability of electricity and any increases in distribution capacity, to meet future need. They also show local heat demand, locations of existing local heat networks and any opportunities to develop new networks.

4.33    Innovative approaches to cooling are evolving and can help to improve Power or Water Usage Effectiveness ratios.

4.34    The latest best practice relating to generator testing and emissions reduction and mitigation (see Part G) refers to guidance produced by statutory and professional bodies, including the GLA and the Environment Agency. While manufacturer requirements may provide a baseline for safe operation, testing protocols should be restricted to the minimum extent necessary to ensure safe, reliable, and consistent operation. This includes testing the smallest practicable number of engines at any one time. Innovation in relation to digital monitoring and predictive maintenance is rapidly evolving, allowing for reduced testing times and frequencies, and the emergence of ‘no-activation’ health checks. It is expected that this will be reflected in such guidance in due course. In consideration of human exposure and cumulative impacts, it is recommended that any required back-up generator testing avoids periods of moderate or higher pollution episodes (defined by London’s air quality monitoring network)59.

4.35    Environment Agency advice states that screening for impacts of emissions on habitats of international significance should consider a 10km zone of influence around the stack60. However, local air quality evidence base work may refine this to particular areas of concern as per Policy GHR10. Plan-making authorities will need to satisfy themselves that any data centre location identified within such an area will be compliant with Habitat Regulations. This approach will not be relevant if alternative back up power sources without such emissions impacts become the norm.

4.36    Data centres are not included in the definition of industrial land for the purpose of this Plan. If a data centre proposal comes forward on designated industrial land before the plan-making authority has identified suitable locations within its Local Plan, the criteria for suitable locations should be applied in the interim.

4.37    As set out by policy PV7, when considering data centres proposals within the Green Belt, grey belt land or the edge of BLGs in the Green Belt (see Part B(2) above) may be prioritised where the other requirements of this policy are met. This differs from the approach to industrial uses, such as storage and distribution, where increased operational impacts such as HGV trip generation mean that a more targeted, strategic focus within identified Green Belt industrial BLGs is required.

4.38    Appropriate benefits for local communities will relate to wider policy objectives, including potentially suitable ancillary uses and affordable workspace, access to affordable computing, support for local skills development, targeted environmental, transport or other infrastructure improvements. They will depend on local circumstances - but would help to mitigate impacts on affected communities and help to ensure that data centres play a positive role in local areas.

4.39    In urban design terms, benefits could be achieved from flexibility to enable future upgrades or reuse, where possible, and from mitigating the scale/massing of larger data centres to facilitate integration into their surroundings without compromising essential security requirements. 

4.40    Outside of suitable locations, development proposals should demonstrate the need, including for example proximity to (latency requirements of) specific end-users, and suitability in the specific location. This may need to be supported by infrastructure investment, for example the provision of a necessary substation or fibre connection.

Rationale

This policy reflects a number of key considerations:

4.41    London is home to Europe’s largest data centre cluster. They support the growth of important data-driven sectors and AI. But this growth will only deliver real benefits for London if the infrastructure that enables it is clean, efficient and aligned with the Mayor’s climate goals. Therefore support for the growth of data centres in London will focus on clean, green and efficient facilities that embrace innovation and benefit Londoners.

4.42    Epping Forest SAC is known to experience adverse impacts of nitrate and ammonia deposition. Mitigations and modelling are focused on impacts derived from vehicular combustion engines and traffic congestion. They do not account for back-up generators and their testing regimes, therefore this policy is intended to minimise any such impacts.

GLE4 Night-time economy

  • Policy aim: to protect and promote London’s thriving 24-hour economy and public houses, and support the night-time workforce, enabling the efficient operation of night-time businesses and sectors such as food and beverage, culture, hospitality, nightlife, retailing, healthcare and logistics.
  • Applies to: Night-time and nightlife uses
  • Locations: town centres, high streets, CAZ, cultural clusters, areas with industrial uses and other areas of strategic night-time activity

Plan-making

A    Plan-making authorities should plan for growth in the night-time economy and nightlife in ways that:

(1)    boost economic activity in hospitality, culture, nightlife and events and support the vibrancy of town centres, high streets and the CAZ
(2)    positively impact London’s reputation as a destination for tourism, business, investment and hosting events including major cultural and sporting events
(3)    support the 24-hour operation of SILs and LSIS
(4)    seek to protect and future-proof night-time areas from sensitive land uses and enable increased housing where appropriate
(5)    support an integrated approach through proactive coordination and engagement with licensing, transport, out-of-hours servicing and deliveries, community safety and security, and environmental and cleansing services
(6)    protect public houses where they have a heritage, economic, social or cultural value to local communities, or where they contribute to wider policy objectives for CAZ, town centres and night-time economy areas.

Development management

B    Development proposals should:

(1)    support a diverse mix of night-time uses, including creative and community activities, applying the Agent of Change principle as required for their protection
(2)    provide safe, inclusive, and accessible environments at night, designed for all, with particular consideration given to race, sex, age, sexual orientation and disability 
(3)    support the provision of facilities for night workers including late-night shops, cafes, toilets and places of shelter
(4)    retain existing public houses where they have a heritage, economic, social or cultural value to local communities
(5)    retain public house use, as part of redevelopment of the building, where this would support placemaking and the existing public house does not have a heritage, economic, social or cultural value to local communities
(6)    accept the loss of a public house where there is no realistic prospect of the building being used as a public house in the foreseeable future supported by compelling marketing evidence.

C    Proposals for new public houses should be supported where they contribute positively to the vibrancy of town centres, CAZ and nightlife clusters.

D    Proposals for sensitive uses should be designed from the outset to minimise and mitigate any identified or potential nuisances generated by nearby existing and permitted night-time uses, in line with the agent of change principle. This means that new development and particularly any sensitive uses should mitigate significant adverse impacts through separation, layout/orientation, screening, ventilation, filtration and acoustic design measures to ensure that night-time and ‘nuisance’ generating operations are not compromised.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.43    London’s strategic town centres contain night-time economic activities that function at different scales and have different catchments. They have been classified, as set out in Annex B Town centre network, Table B1, into four broad categories:

  • NT1 – Centres of international or national significance
  • NT2 – Centres of regional or sub-regional significance
  • NT3 – Centres with more than local significance
  • NT4 – Centres with local significance

4.44    The Agent of Change principle protects existing and permitted activities from new sensitive development proposals in their vicinity. A technical assessment should detail the potential nuisance generated by relevant nearby night-time activities including on their access routes and set out design measures taken to avoid or minimise their impacts to acceptable levels for neighbours. This should also demonstrate the effectiveness of mitigations, which should be secured through planning conditions. Planning and licensing are separate but complementary regimes. Applicants should engage early with both services where proposals may affect existing pubs, music venues, cultural spaces, events or nearby noise sensitive development.

4.45    Policies should ensure inclusion, safety, and representation in the broader planning of our city for hours of darkness.

4.46    The loss of public houses; (both the specific building/establishment itself and the use) can have a detrimental effect on an area, particularly when they serve a social and cultural function. Where there is a risk of such detrimental impacts through the loss of valued public houses and their associated uses (such as restaurants and theatres), boroughs may also wish to consider the use of other tools such as nominations to designate as an Asset of Community Value (ACV) which can be a material planning consideration.

Rationale

This policy reflects a number of key considerations:

4.47    Night-time uses are a key part of London’s economic and social functioning, and occur between 6pm and 6am. The night-time economy consists of nightlife activities and spaces for Londoners to participate in, as well as the wider range of economic operations and services that support the city’s role as a 24-hour city.

4.48    There will be housing growth across London in line with MBUL1. Planning for the growth in night-time and nightlife uses should recognise this context, and seek proportionate measures that would future-proof these uses and centres of night-time activity from sensitive uses.

4.49    The night-time economy and nightlife need to be protected and planned with due regard to equality considerations. Many Londoners — particularly women, LGBTQ+ people, disabled people, and night workers — experience barriers to accessing and participating in the city at night.

4.50    Given the broad nature of the national Agent of Change principle, this policy seeks to improve certainty and ensure a consistent approach across London to address challenges that existing and permitted night-time uses or clusters of those uses are facing in the context of the high/increasing development densities in many parts of London.

GLE5 Culture and creative industries

  • Policy aim: to promote London’s rich cultural offer through the enhancement and protection of its diverse range of cultural facilities and creative industries
  • Applies to: Cultural and Creative facilities and development proposals for them or which impact on them
  • Locations: all locations including cultural facilities and creative industries

Plan-making

A    Plan-making authorities should:

(1)    protect existing and promote new or enhanced locally distinct and strategic clusters of cultural uses and facilities in support of regeneration and town centre renewal 
(2)    consider requiring the replacement of a facility or use, where a development proposal leads to the unavoidable loss of a cultural space
(3)    protect Creative Enterprise Zones (CEZ) designations in Local Plans and include policies that support zone objectives
(4)    protect and manage new and existing cultural production and creative workspace in CEZs, providing flexibility for changing business needs, including affordable workspace (see GLE7 Affordable workspace) and related ancillary facilities.

Development management

B    Development proposals should:

(1)    protect existing cultural facilities and creative industries (consumption and production)
(2)    support the development of new cultural facilities for consumption and production uses, both standalone proposals and as part of wider development proposals.

C    Proposals for major development of cultural consumption uses should be supported in the CAZ and town centres and places with good public transport connectivity.

D    Where there are existing cultural facilities, development should provide/re-provide at least an equivalent amount of cultural space with similar affordability for end users in line with GLE7 Affordable workspace.

E    The use of vacant properties and land for pop-ups or meanwhile uses for cultural and creative activities during the day and at night-time should be supported. This may also be appropriate in industrial areas, where the safety of visitors is addressed and if it can be ensured that industrial activities including any 24-hour operations are not compromised.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.51    Boroughs are encouraged to assess and evaluate the supply and demand of cultural and creative uses and facilities making use of the Mayor’s Cultural Infrastructure Map and consider how and where cultural consumption and production spaces need to be promoted and protected including through site allocations to meet demand. This should take into account demographic changes, the potential to support placemaking and integration with wider networks.

4.52    Boroughs will be responsible for defining CEZs in their Local Plans and developing local policies to address and maintain the objectives of the Zone. Designation of CEZs will support the provision of suitable and affordable creative workspaces and associated users.

4.53    The protection of cultural uses and facilities benefits significantly from the application of the national Agent of Change principle, given that these may often by their nature generate noise and other impacts. See GLE4 Night-time economy for further details.

4.54    Where there is a risk of detrimental impacts through the loss of valued cultural facilities and uses, boroughs may also wish to consider the use of other tools such as nominations to designate such facilities as an Asset of Community Value which can be a material planning consideration.

4.55    In the replacement of cultural facilities, boroughs are encouraged to consider the importance of continuity of use, right of first refusal for the existing operator, the reprovision of appropriate space for the user group and that the space would be financially viable and sustainable for the operator to ensure that the cultural offer is not lost during redevelopment or unable to be realised post-development.

4.56    An Equalities Impact Assessment should be undertaken if the development proposal would lead to impacts on protected characteristics groups, and this should inform the reprovision of space. The Mayor’s Designing Space for Culture (2022) guidance should be considered to ensure that cultural spaces are designed fit for purpose, and the Mayor’s Securing Cultural Infrastructure and Workplace61 planning practice note should be used to help secure these provisions.

Rationale

This policy reflects a number of key considerations:

4.57    Culture includes a range of uses and activities such as music and performance venues, visual arts, fashion, film, design, crafts and making, cinemas and museums. Culture, cultural venues and creative industries play a hugely important role in the economy and society – and nowhere more so than London. London’s rich cultural offer delivers significant economic and social benefits for London and its diverse communities.

4.58    However, London’s cultural venues and creative spaces face a range of threats, including the loss of premises to alternative uses and affordability. Finding new premises can be difficult due to the availability of appropriate space at an affordable price. The loss of cultural spaces can have a detrimental effect not just on an area but also more widely – they often form part of a locally or strategically important eco-system as well as serving a local community function.

GLE6 Visitor infrastructure

  • Policy aim: to strengthen London’s role as a world-leading visitor destination and spread economic and regeneration benefits of tourism
  • Applies to: development proposals which involve enhancement, extension and inclusive access of London’s visitor economy including its attractions, visitor accommodation and other supporting infrastructure
  • Locations: all

Plan making

A    Local plans should promote sustainability and inclusive access of London’s visitor economy during the day and night, having regard to the needs of business and leisure visitors.

B    Local plans should promote and support development associated with new and existing visitor attractions, and promote enhancements to legibility, visitor experience and management, the historic environment and other supporting infrastructure including serviced accommodation, the public realm, toilet facilities and access by public transport, walking and cycling.

Development management

C    Development of serviced visitor accommodation should be supported in the CAZ, town centres and high streets. Elsewhere in London, serviced visitor accommodation development should only be supported in locations that are well-connected by public transport and in line with the national sequential test for town centre uses.

D    The intensification of the provision of serviced visitor accommodation should be supported in locations that are well-connected by public transport, and where it would not lead to negative impacts on housing supply, strategic capacity for employment uses or local amenity.

E    Development proposals for serviced visitor accommodation should ensure sufficient choice for people who require an accessible bedroom and provide either:

(1)    10 per cent of new bedrooms to be wheelchair-accessible
(2)    15 per cent of new bedrooms to be accessible rooms.

F    Development proposals for camping and caravan sites should be supported in appropriate locations having regard to strategic and local policy designations.

G    Development proposals for short-term let visitor accommodation (which exceed national policy permitted time limits) should be resisted where they have a negative impact on the housing stock, local housing need and/or local amenity.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.59    A positive approach should be taken to supporting new serviced visitor accommodation in sustainable locations including the CAZ, town centres, high streets and other locations that are well-connected by public transport. It is recognised however, that in some localised instances, there can be tensions with other important land use objectives including housing supply and capacity for other employment uses. When considering whether capacity for other uses could be compromised by new serviced visitor accommodation, regard should be given to evidence in strategic and local assessments of demand and supply, local market conditions and development monitoring.

4.60    Serviced accommodation developments should include, as a minimum, accessible and inclusive design measures in line with Approved Document M: access to and use of buildings. To implement Part E of London Plan policy, wheelchair-accessible rooms should be designed in accordance with Figure 52 incorporating either Figure 30 or 33 of British Standard and BS 8300-2:2018 Design of an accessible and inclusive built environment Buildings Code of practice. Accessible rooms should be designed in accordance with the requirements of 19.2.1.2 of British Standard BS8300-2:2018.

Rationale

This policy reflects a number of key considerations:

4.61    London is a world-leading visitor destination, and it is important to strengthen this role through enhancements to its attractions, visitor accommodation and other supporting infrastructure whilst spreading the economic and regeneration benefits of tourism to sustainable locations across the city in line with the London Growth Plan.

4.62    Research has shown that there is need for accessible hotel bedrooms to meet the needs of visitors with accessibility requirements. The provision of accessible transport, public realm, and sporting and cultural venues needs to be complemented by the availability of accessible serviced accommodation to ensure that all visitors can stay in London and experience its visitor offer.

GLE7 Affordable workspace

  • Policy aim: to provide workspace for specific social, cultural, place-making or economic development purposes that is affordable for end-users
  • Applies to: developments including offices, research and development and/or light industrial uses (Use Class E(g)), data centres and B8 storage or distribution uses
  • Locations: as defined in Local Plans and existing affordable workspace

Plan-making

A    Plan-making authorities should include policies to support the delivery of affordable workspace, triggered by applications for new office, research and development or light industrial uses (Class E(g)), data centres and/or B8 storage or distribution uses where justified by strategic and local evidence of need and an assessment of viability.

B    Affordable workspace delivery should support specific social, cultural, place-making or economic purposes such as:

(1)    sectors that have cultural value including cultural production space (such as creative and artists’ workspace, rehearsal and recording space) and cultural consumption space
(2)    specific uses (such as hospitality, independent food and beverage uses) that contribute towards the vitality and wider ecosystem of economic activity in the CAZ and town centres
(3)    for disadvantaged or under-represented groups in the labour market in any sector
(4)    sectors with social value functions such as charities, voluntary and community organisations or social enterprises
(5)    educational outcomes through connections to schools, colleges or higher education
(6)    start-ups and early-stage businesses or regeneration.

C    Local Plans should set out:

(1)    the locations where the affordable workspace policy applies
(2)    the scale of office, research and development and/or light industrial use (Class E(g)), data centre and B8 storage or distribution floorspace that would trigger a requirement for affordable workspace provision
(3)    the range of uses that can be delivered as affordable workspace including creative workspace/ light industrial uses, offices, research and development uses (Class E(g)), other Class E commercial, business and service uses (including independent food and drink, retail, health and creches), community uses (Class F1/F2) and/or cultural-related sui generis employment uses, having regard to local evidence of need and the social, cultural or economic development purposes set out in Part B above
(4)    the amount of affordable workspace to be provided (quantum or percentage of proposed office, research and development and/or light industrial use (Class E(g)), data centre and B8 storage or distribution floorspace)
(5)    the expected average discount to prevailing market rents
(6)    the length of time for the affordable workspace provision, and
(7)    circumstances where off-site provision or payments in lieu is likely to be supported.

Development management

D    Affordable workspace can be provided on-site, or in an off-site location, particularly where it is not practical or feasible to deliver on-site or economies of scale or greater levels of discount and duration of provision could be achieved through alternative means and locations. In such cases, off-site provision and/or a financial contribution to a local authority affordable workspace fund (supported by a local authority affordable workspace strategy) should be made.

E    Where there is existing affordable workspace on-site (or has been since 1 December 2017), proposed development should re-provide at least an equivalent amount of affordable workspace (with the same or enhanced affordability for end-users), unless the existing affordable workspace has been provided on a temporary or meanwhile basis pending the redevelopment of the site.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.63    Affordable workspace is defined here as workspace that is provided at rents maintained below the market rate for that space for a specific social, cultural, or economic development purpose. Plan-making authorities are encouraged to supplement their local plan policies, where appropriate, with a local affordable workspace strategy setting out more detailed matters to support implementation. Where permission is sought for flexible Class E development, decision-makers should apply the policy if the physical configuration and/or intended use of the space is expected to include Class E(g) uses.

4.64    When considering need, affordability and the appropriate average discount on rent in local plan policies and at scheme level, relevant factors may include the location; the availability and take-up of existing affordable workspace and other lower-cost secondary business space in the general vicinity; the type and quality of the affordable space; the intended provider; and end-users. Other factors that affect affordability for end-users, include service charges, fit-out costs, lease and rent structures and business rates. Flexibility for variable percentage levels of floorspace and variable percentage levels of rental discount should be supported where this addresses the needs of particular end-users and locations.

4.65    Off-site provision and payments in lieu may be particularly suitable for data centre and B8 storage or distribution development and to secure greater benefits such as affordable workspace contributions from new Class Eg(i) office development in prime locations in the CAZ (to be determined locally) or to support communal off-site affordable workspace hubs for example, including in town centres, Strategic Economic Clusters and CEZs (except those in Strategic Industrial Locations). On-site provision can help to sustain a mix of business, leisure or cultural uses which contribute to the character or function of an area including, for example, affordable independent food and beverage uses on the ground floor or office buildings to support active frontages in the CAZ. For research & development uses, on-site provision would typically be preferable to support shared use of facilities.

4.66    Affordable workspace should be secured through a planning obligation in perpetuity (or, where this is not feasible or viable, for a period of at least 15 years) and should include mechanisms to ensure its timely delivery. Flexibility on the amount of affordable workspace as a percentage of total proposed Class E(g), data centre and/or B8 storage or distribution use may be appropriate where this delivers greater benefits in terms of higher rates of discount on rent and/or a longer period of time for the affordable workspace provision.

4.67    A scheme-level affordable workspace strategy and management plan can set out how the affordable workspace will be delivered, configured (in relation to the open market space if on-site), fitted out for occupation, marketed, managed and monitored. Affordable workspace strategies and management plans should make clear the intended social, cultural or economic development purpose of the space, its contribution to wider social value and the intended beneficiaries or target groups.

4.68    Applicants are encouraged to engage with workspace providers at an early stage in the planning process to ensure that the space is configured, fitted out and managed efficiently. Arrangements for engaging a provider, how the space will be owned or leased and the process for review, changes in terms, disposal or termination, should be agreed with the local plan-making authority. Leases or transfers of space to workspace providers should be at rates that allow providers to manage effective workspace with sub-market rents, meeting the objectives of this policy over the affordable workspace term. The Mayor’s Securing Cultural Infrastructure and Workspace62 planning practice note provides guidance to help secure these provisions.

4.69    Where a site is to be used for temporary affordable workspace, this will generally be more appropriately secured through a temporary planning permission and must not prevent sites from being brought forward for development in a timely fashion. Parameters for any temporary or meanwhile use, particularly in relation to length of time for the temporary affordable workspace provision and associated obligations, should be established from the outset and agreed by all parties.

Rationale

This policy reflects a number of key considerations:

4.70    The provision of workspace across London that is affordable for end-users for specific social, cultural, place-making or economic development purposes plays a key role in supporting a more inclusive economy. Policies to support its delivery across a range of uses are important to support the London Growth Plan ambitions and provide opportunities for Londoners to start-up and run a business.

GLE8 Access to employment and skills

  • Policy aim: to secure good quality employment and training opportunities in major developments for Londoners, including those who are out of work, under-employed or from under-represented groups in the labour market.
  • Applies to: Major development
  • Locations: all

Development management

A    Major development proposals (or locally determined development thresholds in local plans) should support Londoners into good quality-employment, apprenticeships, and other skills development and training opportunities in the construction phase and in the completed final use (for schemes containing employment uses).

B    These opportunities should be secured through planning obligations and implemented in ways that:

(1)    ensure the greatest possible level of take-up by Londoners of the training, apprenticeship and employment opportunities create, 
(2)    provide opportunities for Londoners who are out of work or under-employed and increase the proportion of under-represented groups in the construction industry workforce and other relevant sectors, and 
(3)    enable Londoners undertaking training to complete their training and apprenticeships, including across borough boundaries.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.71    Employers associated with new development are encouraged to work towards and achieve the objectives of the Mayor’s Good Work Standard63.

4.72    Planning obligations should be used to secure these arrangements and include, where appropriate, financial contributions towards local employment, skills, apprenticeship and training initiatives.

4.73    Employment and training targets included in planning obligations should be based on the number of new employment opportunities (measured on a full-time equivalent basis, in the construction and completed-use phases of development) and apprenticeship and training starts and completions. Take-up of employment and training by London’s out of work, under-employed and under-represented communities in the workforce in relevant sectors appropriate to the development should also be reflected in targets and monitoring. Evidence related to under-represented groups in the labour market can be sourced from the Inclusive Talent Strategy (ITS) and Get London Working Plan64 evidence base.

4.74    Reciprocal arrangements between local authorities are encouraged to open up opportunities, including those created via planning obligations, to residents from adjacent boroughs and across London to enable training to be completed and necessary experience for qualifications to be gained across multiple development sites.

Rationale

This policy reflects a number of key considerations:

4.75    As set out in the London Growth Plan65 and the ITS66, skills are a key driver of growth and opportunity in London. However, the benefits of economic success are not shared evenly across the capital and some Londoners find it harder to gain genuine access to work than others. The difference in the proportions of people in employment between female and male Londoners is eight percentage points. The difference between disabled and non-disabled Londoners is 21 percentage points and the difference between White Londoners and Black, Asian and minority ethnic Londoners combined is 11 percentage points.

4.76    Good-quality employment is promoted through the Mayor’s Good Work Standard67. New developments provide employment opportunities for Londoners both during construction and once completed.

GLE9 Aviation

  • Policy aim: to ensure London’s aviation sector supports sustainable and equitable economic growth while fully addressing its environmental and health impacts
  • Applies to: aviation-related developments and advanced air mobility (AAM)
  • Locations: all locations with existing and potential aviation activity

Development management

A    London’s six main airports – as a single aviation system – should make the best use of existing capacity to ensure sustainable economic growth and jobs in local communities, supported by enhanced surface access by public transport, walking and cycling for passengers, staff and freight, combined with measures to discourage car use.

B    Proposals for expansion at Heathrow and other airports should be refused unless no unacceptable environmental, transport, and congestion impacts are demonstrated.

C    Proposals for expansion at Heathrow should be subject to commitment to contribution, provision, and/or improvement of sustainable surface access as identified in MBUL1 Spatial Strategy, the key diagram and Annex D.

D    New heliports should be refused, except for the exclusive use of emergency services. Any significant shift in the mix of operations at other airports should also be refused.

E    Aviation-related proposals that result in a change in airport operations or air traffic movements should be assessed against the policies of this Plan and should:

(1)     assess and fully address their environmental and health impacts 
(2)     fairly share the benefits with local and affected communities
(3)    contribute towards sustainable surface access, demonstrating that any additional trips will be made by public transport, walking and cycling, and that transport networks can accommodate the additional demand alongside forecast background growth, and
(4)    engage with local communities and other stakeholders to consider all impacts and their mitigation.

F    Proposals for AAM, which include drones and electric vertical take-off and landing (eVTOL) vehicles and their associated ground infrastructure (such as droneports), should consider safety, security, social and economic value, equity, accessibility, opportunity cost of land use, implications for the environment and public health – including noise, privacy, and visual disturbance – and support for sustainable and active travel.

G    AAM proposals should include assessments of all the principles set out in Part F as well as the air and surface trips generated or substituted by the site. The spatial distribution and cumulative impacts of AAM sites should also be assessed.

H    AAM providers should monitor and share data on their operations and associated impacts and mitigations with relevant authorities including Transport for London.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.77    The London Plan is important and relevant to the determination of an application for development consent alongside the NPPF and relevant local plan policies, with the Airports National Policy Statement (ANPS) as the primary decision-making framework.

4.78    New heliports (except for emergency services) should be restricted, as should the shift in the mix of operations at other airports (such as the introduction of scheduled flights at airports not generally offering such flights) so as not to allow proliferation of aviation activity that does not contribute to strategic and sustainable economic growth.

4.79    Future regulatory and technology improvements have the potential to reduce an airport’s environmental footprint and can allow for more flights without any increase in environmental impacts. These and any other benefits from the aviation sector should be fairly shared with communities.

4.80    AAM is an emerging technology and understanding of its operations and implications will increase over time. The principles set out in policy provide an initial framework for considering any AAM-related proposals to minimise harm and maximise benefits.

4.81    Until any future legislation, AAM proposals can be considered sui-generis use class, and assessed on a case-by-case basis through the policy and any future guidance.

Rationale

This policy reflects a number of key considerations:

4.82    London’s six main airports (Heathrow, Gatwick, Stansted, Luton, City and Southend) play a vital role in supporting London as a global city and engine for economic growth. Heathrow is classified as a strategic economic cluster in this Plan.

4.83    However, there can be significant environmental and health impacts associated with aviation from air pollution (including ultrafine particles); noise (both averaged over a period and from individual events); and greenhouse gas emissions (from flights and airport ground operations, and trips to and from the airport). The policies require that these environmental and health impacts should be fully assessed and effectively addressed.

4.84    Any expansion or increase in operations will also generate increased passenger, staff and/or freight traffic, which can lead to congestion and public transport crowding. As such, it is essential to improve public transport connectivity in order to reduce highway trips.

GLE10 Safeguarded Wharves

  • Policy aim: to ensure that London has adequate and appropriate wharf capacity to meet the city's needs for more than 11 million tonnes (mt) of waterborne freight handling capacity up to 2050
  • Applies to: proposals for changes of use of safeguarded wharves to non-waterborne freight handling activities and others which could negatively affect the ability of wharves to operate effectively
  • Locations: within and adjacent to London’s safeguarded wharves

Plan-making

A    Development Plans should:

(1)    define the boundaries of safeguarded wharves in accordance with the latest Safeguarded Wharves Review and Directions and ensure site allocations and other relevant policies manage nearby development to ensure that wharves are able to operate effectively 24 hours a day, seven days a week
(2)    in conjunction with the Port of London Authority (PLA) and wharf operators, explore opportunities for new, expanded or more efficient wharves in areas of known deficiency
(3)    where Policy PV1 Brownfield First Opportunity Areas and Annex E identifies a need for wharf consolidation to optimise BFOA development potential, in conjunction with the PLA, wharf operators and neighbouring boroughs, explore the opportunities and options for wharf consolidation or adequate compensatory capacity within the same property market area
(4)    where applicable, appropriately manage the release of those wharves where the safeguarding direction no longer applies, or where a review has recommended release, ensuring any other wharves in the vicinity are not negatively impacted and overall freight handling capacity is sustained.

Development management

B    Development proposals to facilitate an increase in the amount of freight transported on London’s waterways should be supported.

C    Development proposals on safeguarded wharves should:

(1)    reflect the safeguarding protection for waterborne freight use only, making best use of the wharf’s capacity and location
(2)    demonstrate that waterborne heavy goods freight-handling capacity and effectiveness is secured long term, 24 hours a day, seven days a week and that existing capacity and functionality would not be compromised as part of any mixed-use or temporary use proposals
(3)    Only result in the loss of a safeguarded wharf to non-waterborne freight uses where:

i.    it is part of a plan-led process that secures adequate compensatory capacity in the same property market area/wharf sector; or 
ii.    up to date evidence accounting for different market scenarios demonstrates that the wharf is no longer viable or capable of being made viable for waterborne freight handling.

D    Development proposals adjacent to or opposite safeguarded wharves (including vacant wharves) should be designed to ensure that existing or future freight use and capacity is not hindered and is able to operate 24 hours a day and seven days a week, in line with the Agent of Change principle.

E    Existing boatyard sites supporting freight transport by water should be protected and development proposals to increase their capacity or range of services should be supported.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.85    Safeguarded wharves can only be released from their safeguarding designation as part of a Safeguarded Wharves Review and subsequent revocation direction. The timing of these relative to Local Plan timetables may mean it is appropriate for such plans to reflect the latest review even if a subsequent safeguarding direction or revocation has yet to be issued.

4.86    Redevelopment proposals for other land uses on safeguarded wharves will need to be embedded in a plan-led process that can interface with this process or produce equivalently robust viability evidence. The scale and form of compensatory capacity assessed to be adequate would typically relate to functionality for handling ‘heavy goods’ freight (as opposed to that transportable onward by LGV) as well as volume. It should be within the same river sector (as defined in the GLA’s wharves evidence) which affects berth/access depths and property market areas. The Mayor has, and will continue to, keep the network of safeguarded wharves under regular review given many are in areas where land is highly desirable for a number of competing uses.

4.87    Alternative use of a boatyard site should only be accepted if the facilities of the site are re-provided at a site with equivalent or enhanced facilities in Greater London. Proposals for new strategic-scale boatyard sites, at an appropriate site within London, will be supported.

Rationale

This policy reflects a number of key considerations:

4.88    Since 2000 a network of wharves in London has been subject to Safeguarding Directions issued by the Secretary of State for Housing, Communities and Local Government. The Safeguarding Directions mean that prior to the grant of planning permission on a Safeguarded Wharf, the Mayor must be consulted, with the London Plan protecting them for waterborne freight handling. This recognises the value of waterborne transport in removing lorries from roads and efficiently importing materials such as marine-won aggregates.

4.89    Evidence68  indicates that there will be a shortfall in wharf handling capacity over the London Plan period, making it important that capacity is protected, enhanced and promoted in order to meet identified need through this policy. Supporting infrastructure forms part of this protection and promotion, enabling vessels to be appropriately maintained close to where they are used with the efficiency benefits this brings.

GLE11 Circular economy

  • Policy aim: to support the move to a more circular economy that reduces London’s resource footprint and makes best use of embodied carbon as part of the transition to net-zero
  • Applies to: all developments
  • Locations: all locations

Development management

A    All development proposals should promote circular economy outcomes and referable proposals should aim to be net zero-waste at the construction stage.

B    For referable development, a Circular Economy Statement (CES) - submitted at planning application and post-construction stages should demonstrate how:

(1)    pre-redevelopment and pre-demolition audits have informed the design of the proposed development in the context of strategic targets for waste minimisation
(2)    the proposal’s design and construction will reduce material demands and enable building materials, components and products to be disassembled and re-used at the end of their useful life, for the whole development
(3)    the development has been designed in line with circular economy principles set out at paragraph 4.94
(4)    much waste the proposal is expected to generate, and how and where the waste will be managed in accordance with the waste hierarchy
(5)    performance against the targets set out in Table 4.2 will be monitored and reported post-planning and post-construction.

C    Development proposals which seek to provide Circular Economy infrastructure on appropriate sites, including as a ‘meanwhile use’, should be supported.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.90    Table 4.2 sets out a range of strategic targets which support aims to conserve resource, reduce waste and promote material reuse and recycling across London. On an individual application, these are helpful as benchmarks against which to assess the proportionality of what is proposed alongside wider justification, except on referable development where experience shows they should be more achievable.

4.91    All development proposals should be able to demonstrate some consideration of how they can advance circular economy objectives. Referable applications should provide a commitment and provide evidence that demonstrates how they will meet and where possible, exceed these targets. The actual performance against these targets should be reported by applicants as part of the post-completion reporting.

4.92    CES are required for referable applications only, although they may provide a useful framework for other proposals to consider circular economy opportunities.

Table 4.2: Strategic waste stream targets

Table 4.2: Strategic waste stream targets
Waste streamMinimum strategic target
Demolition waste95% reuse/recycling/recovery
Excavation waste95% beneficial reuse69
Construction waste95% reuse/recycling/recovery
Reused or recycled content20% by value for the whole development

4.93    The CES process should be iterative and help inform design. As such it is helpful for them to be prepared and submitted at pre-application stage for large-scale multi-phased development, developments that involve substantial demolition or masterplan-led schemes.

4.94    The circular economy principles that should be taken into account through demolition, construction and in-use phases are: 

  • building in layers – ensuring that different parts of the building are accessible and can be maintained and replaced where necessary
  • designing out waste – ensuring that waste reduction is planned in from project inception to completion
  • designing for longevity
  • designing for adaptability and flexibility
  • designing for disassembly
  • using systems, elements or materials that can be reused and recycled.

4.95    Development proposals should seek to manage as much waste on site as possible, and strategies which prioritise retention of existing structures should be robustly considered. Further guidance can be found on the GLA website70, which will be updated as appropriate to account for best practice.

4.96    There is a close relationship between the circular economy statement and the Whole Life Carbon Assessment. It should be ensured that where metrics/criteria overlap, the same are used in both assessments.

Rationale

This policy reflects a number of key considerations:

4.97    While the importance of supporting a more circular economy is acknowledged in national policy, it is not set out how this should happen. This policy seeks to address that gap in the London context.

4.98    This is important in delivering the Mayor’s London Environment Strategy which includes objectives to support a transition to a circular economy, cut waste and boost recycling. The policy seeks to ensure that circular economy principles – and a whole life cycle view – are incorporated into the design of referable developments and that it supports the provision of circular economy infrastructure.

4.99    The Mayor views waste as a resource to be managed rather than a problem to export. Cutting waste and recovering more value from it through applying circular economy principles can have positive environmental and economic benefits for London, including but not limited to job creation, saving resources, increasing resource efficiency of London’s businesses, and helping to reduce carbon emissions.

GLE12 Waste

  • Policy aim: to plan for sufficient waste infrastructure capacity and support a move towards net waste self-sufficiency and improved waste sustainability
  • Applies to: Local Plans and developments involving waste uses
  • Locations: all locations

Plan making

A    Development Plans should plan positively to contribute towards more sustainable waste management in London including net self-sufficiency in line with the proximity principle, prioritising reuse, recycling and circular economy needs.

B    Development Plans should plan – preferably cross-boundary - for the range of infrastructure required to manage and reduce waste through a combination of protection of waste sites, identification of suitable new sites and opportunities for expansion or intensification, and facilitation of reprovision where appropriate. This means ensuring:

(1)    provision is sufficient to manage the apportioned tonnages of materials and waste, as set out in Table 4.3
(2)    no net loss in capacity of strategically important waste management, including that required to manage construction, demolition and excavation (CD&E) and hazardous waste materials within London, and
(3)    provision continues to be made for other non-apportioned waste uses.

C    In identifying sites and capacity to protect and allocate to meet apportionments and other needs, the following should be considered:

(1)    existing waste and secondary material sites/land, particularly waste transfer facilities, with a view to maximising their (environmentally appropriate) capacity 
(2)    SILs and LSISs, including safeguarded wharves with an existing or future potential for waste and secondary material management 
(3)    proximity to strategic roads, safeguarded wharves and railheads which may help reduce transport-related impacts.

D    Where a site is identified for release in a development plan it should either:

(1)    be demonstrably surplus to both the borough and other London boroughs in apportionment terms, having been first offered to other boroughs that have not yet met their apportionment targets 
(2)    be replaced with equivalent capacity at the same level or higher in the waste hierarchy, unless it is strategic waste management capacity in which case equivalent capacity should be provided at a like-for-like facility.

Development management

E    Waste sites should be protected as such unless either:

(1)    the site has been identified within an adopted waste plan for release
(2)    compensatory capacity at the same level or higher of the waste hierarchy is provided, with throughput at the same level or higher, within the location taking into account site characteristics and the proximity principle. Where strategically important waste infrastructure is proposed to be lost, like-for-like compensatory capacity should be secured. Where a hazardous waste site is involved, any replacement should provide equivalent hazardous waste management capacity.

F    Development proposals for new waste management sites or increased waste management capacity at existing sites should:

(1)    have reviewed and where possible responded to opportunities to move waste up the waste hierarchy and contribute to the delivery of a circular economy
(2)    where appropriate, deliver a range of complementary waste management and secondary material processing facilities on a single site
(3)    address the locational considerations in part C, and
(4)    achieve at least a no net worsening of carbon and air quality outcomes.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.100    A waste site is defined as either:

  • a site whose primary activity is a waste-management operation that is authorised by the Environment Agency
  • a site that has a lawful planning use as a waste site.

4.101    Strategic waste-management capacity is defined as sites that are critical to the management of London’s waste – such as dry mixed-recycling facilities; facilities that handle food waste; waste-transfer sites; or waste sites linked to wharves and railheads.

4.102    Environmentally appropriate capacity maximisation will largely be determined by separate nuisance legislation, but the evolving nature of a place should also be taken into account, given that the Agent of Change principle only applies to established use intensity.

4.103    Table 4.4 shows estimated projections of arisings for household, commercial and industrial waste for each borough, that underpin the overall apportioned quantums that should be planned for. In addition to apportioned waste, waste-planning authorities should ensure that their plans seek to meet the demand for waste streams that are not apportioned, and other infrastructure that could include, but is not limited to, hazardous waste, waste transfer sites and CD&E waste. The policy identifies locational criteria that should be considered in identifying the suitability of a proposed or potential waste site.

Table 4.3: Borough-level apportionments of household, commercial and industrial waste 2024-2050. Rounded to the nearest kilotonne

Table 4.3: Borough-level apportionments of household, commercial and industrial waste 2024-2050. Rounded to the nearest kilo tonne
BoroughApportionment*2024203020402050
Barking and Dagenham6.6506536603676
Barnet2.4183194219245
Bexley5.6431456513575
Brent4.7363385433485
Bromley3.5269285320359
Camden1.5118125140157
City of London2.1165175196220
City of Westminster1.6126133150168
Croydon3.0234248279313
Ealing4.7366387436488
Enfield4.8369391440493
Greenwich3.3253268301337
Hackney1.5115122137153
Hammersmith and Fulham1.7133141158177
Haringey2.4187198223250
Harrow1.7133141158177
Havering4.6357378425477
Hillingdon5.9453480540604
Hounslow4.8368390438491
Islington1.8139148166186
Kensington and Chelsea1.0778292103
Kingston upon Thames1.9145154173194
Lambeth1.7129137154173
Lewisham2.6199211237265
Merton3.1236250281315
Newham4.9379402452506
Redbridge2.2166176198222
Richmond upon Thames1.6124131148166
Southwark3.0230244274307
Sutton3.2250265298333
Tower Hamlets1.9149158178199
Waltham Forest2.4186197221248
Wandsworth2.1163173195218
London Total*100%7,6998,1599,17710,281

*Apportionment is per cent share of London’s total waste to be managed by borough

**NB. Totals do not add up to exactly 100 per cent or total tonnage due to rounding

Table 4.4: Forecast (kilotonnes) arisings of household, commercial and industrial waste by borough 2024-50

Table 4.4: Forecast (kilo tonnes) arisings of household, commercial and industrial waste by borough 2024-50
Borough2024203020402050
Barking and Dagenham563594641689
Barnet242259291325
Bexley374394429468
Brent343365407449
Bromley397420475547
Camden140149169192
City of London275307373452
City of Westminster189199225255
Croydon302319365413
Ealing259274304334
Enfield298314355401
Greenwich292313353392
Hackney122125135148
Hammersmith and Fulham8793107121
Haringey172182206224
Harrow154162181198
Havering300316367427
Hillingdon356377436501
Hounslow273291332379
Islington202217246281
Kensington and Chelsea56565963
Kingston upon Thames102106120131
Lambeth130137151167
Lewisham278294326366
Merton272288323362
Newham333358408457
Redbridge213223255286
Richmond upon Thames80808082
Southwark318343396450
Sutton132138153170
Tower Hamlets157166187201
Waltham Forest145150164174
Wandsworth142149160174
London Total7,6998,1599,17710,281

4.104    MDCs should cooperate with host boroughs to support them in meeting identified waste needs. Where appropriate, MDCs are encouraged to join the relevant waste planning group.

4.105    A borough’s ability to meet its apportioned waste needs in full is key to supporting a move towards overall waste net self-sufficiency. Waste plans should be responsive to strategic opportunities within their areas to optimise capacity on existing waste sites, or that help to unlock investment in developing new waste sites or meeting other needs. As such, any proposed release as part of a plan-led process should robustly demonstrate that the loss would not impact on the ability to meet this apportionment target directly (for the borough in question) or indirectly (where it may be a site of interest to other proximate boroughs to meet their apportionment needs). If it is confirmed that it is needed by another proximate borough, a borough in the same waste planning group and/or where there is an existing waste flow, then that should be reflected in the respective waste plan(s). Alternatively, should a waste site be proposed to be released, and a borough is not meeting its identified waste needs, then compensatory capacity is required to be secured through the plan.

4.106    Where required, compensatory capacity should be at the same level or higher within the waste hierarchy, and at least meet (and should exceed) the maximum achievable throughput of the site proposed to be lost. This should be provided prior to the loss of the existing waste site. If a site is not operational at the time that a planning application has been submitted, the maximum throughput over the five years preceding the closure should be used. Where a strategically important waste infrastructure is proposed to be lost, like-for-like compensatory capacity must be secured, i.e. the same waste infrastructure type/specialism, and at least the same capacity, as the waste site proposed to be lost. Where compensatory capacity is to be provided at an existing waste facility, then it should be demonstrated that this is in addition to any capacity that has been identified as meeting apportionment targets and/or waste needs for the borough in which the facility is located.

4.107     Compensatory capacity should be located as close as possible to the existing waste site, taking into account relevant planning designations, waste planning and property market areas, plus the wider spatial strategy approach of providing for some industrial land needs in the Green Belt. Consideration should also be given to the proximity principle, and transportation routes (including by road, rail and water), when identifying compensatory capacity. Where it is provided outside of a borough or waste plan area, the host borough should be notified to ensure that this is taken into account when reviewing waste plans and/or monitoring requirements.

4.108    New waste sites in appropriate locations, as identified in the policy, should be supported. Clear evidence should be provided on how the development proposal is delivering against the policy criteria. Applications should also set out whether the proposed waste site is contributing towards a borough’s apportionment target, and/or how it is otherwise meeting an identified waste need. For new waste sites coming forward, applicants are strongly encouraged to ensure that they achieve a carbon positive outcome. Where waste heat will be generated, proposals should take into account the GHR2 Low-cost low-carbon heat.

Rationale

This policy reflects a number of key considerations:

4.109    As required by the National Planning Policy for Waste, the policy sets out the apportionment requirements for each of the London boroughs. The Mayor’s London Environment Strategy identifies that the Mayor wants to retain the economic value of London’s waste within London, and ensure that London can manage net 100 per cent of its waste within the city. To support achieving this, sufficient waste sites to meet apportionment requirements must be safeguarded through relevant development plan documents.

4.110    Acknowledging that waste streams are not confined by borough boundaries, and are influenced by market conditions and/or land availability, the policy encourages boroughs to pool requirements and, where necessary, share surplus capacity to achieve the London-wide ambition of waste self-sufficiency. To ensure that there is no loss in waste capacity whilst also allowing for flexibility for a waste site to be redeveloped (should it be required to meet other strategic objectives) e.g. housing, compensatory capacity must be provided to ensure that there is no loss in waste capacity.

GLE13 Aggregates and mineral resources

  • Policy aim: to ensure a steady and adequate supply of land-won aggregates within London up to 2050 and deter any proposals for hydraulic fracturing (‘fracking’) in London
  • Applies to: minerals planning and extraction/post-extraction
  • Locations: those boroughs with landbank apportionments and any location where fracking is proposed

Plan-making

A    Plan-making authorities with an apportionment should:

(1)    make provision through site allocations, designation of preferred areas and areas of search for a landbank for seven years supply of at least 5 million tonnes (mt) of land-won aggregates up to 2050 through a landbank apportionment of:

  • at least 1.75mt to LB Havering
  • at least 0.7mt to LB Redbridge
  • at least 1.75mt to LB Hillingdon
  • at least 0.7mt to LB Hounslow

(2)    examine the feasibility of using quarries for construction, demolition and excavation recycling sites where extraction has ceased.

Development management

B    Development proposals for exploration, appraisal or production of shale gas via hydraulic fracturing (‘fracking’) should be refused.

Implementation

In implementing this policy, applicants, plan-makers, decision-makers and others (as relevant) should take account of the following:

4.111    All of London’s boroughs, together with the MDCs, are Mineral Planning Authorities (MPAs). On behalf of all London MPAs, in recent years, the Mayor has conducted the Local Aggregates Assessment (LAA), which regularly reviews the demand and supply of aggregates in the capital (now and into the foreseeable future) against London’s landbank requirements. As such, the most up-to-date version should be used to help boroughs in plan-making to ensure a steady and adequate supply of aggregates. Most of the policy relating to minerals and aggregates is contained in the NPPF; as such, this policy should be read in conjunction with it. There is also a close relationship with MBUL5 Sustainable Transport to enable London’s growth; GLE10 Safeguarded Wharves, which will support additional supply from imports; and GLE11 Circular Economy which supports the supply for secondary and recycled aggregates.

4.112    The Mayor will continue to work with boroughs, and the London Aggregates Working Party to prepare LAAs on behalf of all MPAs in London.

4.113    There is a moratorium on issuing any further hydraulic fracturing licences nationally, until compelling new evidence is provided which addresses the concerns relating to the prediction and management of induced seismic activity. This precautionary approach should be mirrored in respect of planning consents, given such risk is at odds with many planning considerations relating to health, the environment, housing capacity and protection of vital infrastructure and economic activity. The Mayor will actively monitor future changes in national policy and legislation with regard to fracking and will publish a formal statement of supersession when part B of this policy is no longer deemed necessary.

Rationale

This policy reflects a number of key considerations:

4.114    There is a statutory requirement for MPAs to maintain landbanks (permitted reserves) of at least seven years for sand and gravel.

4.115    The apportionment targets are both justified and realistic, contributing to the national Managed Aggregate Supply System. Whilst only four boroughs have apportionments identified, other London boroughs are encouraged to bring forward supplies of aggregate.

4.116    London is in an area that is unlikely to be geologically suitable for fracking and is not within an area found to be commercially viable for fracking but has nonetheless had some licensing interest in the past. At present it is not possible to determine that fracking can be undertaken safely in the UK, due to the British Geological Society findings highlighting that the risk of possible seismic activity cannot be reliably predicted, as set out in Written Ministerial Statement from 2022, and reiterated in 2024. Given that risks would be magnified in London due to the density of population, economic activity and infrastructure, the extensive Source Protection Zones where groundwater must be protected, and the Mayor’s broader climate change obligations, it is clear that fracking is not compatible with the Mayor’s Good Growth objectives from a planning perspective.

References