Skip to main content
Mayor of London logo London Assembly logo
Home

Wheelchair users on buses

  • Reference: 2011/0129
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
What plans do you have to make life easier for wheelchair users on London's bus network?

Tube upgrades (3)

  • Reference: 2011/0128
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
What change has there been since July to the Jubilee Line upgrade list of operational restrictions?

Tube upgrades (2)

  • Reference: 2011/0127
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
How many passenger and engineering trains have had Transmission Based Train Control installed, commissioned and proven reliable across the whole TfL network?

Tube upgrades (1)

  • Reference: 2011/0126
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
In Item 04 of the 21 July 2010 TfL Board Report, TfL outlined a three phase commissioning strategy for the Jubilee line. Which phases are complete and has Transmission Based Train Control been run successfully on a weekday, full revenue basis over J2, 3 and 4?

Litter on Buses

  • Reference: 2011/0125
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
Is litter removed on buses at the end of each route, in a similar way to tubes, before the route starts again?

Unpaid Embassy charges

  • Reference: 2011/0124
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
Please publish a table showing the amount in unpaid Congestion Charge and Penalty Charge Notices that is now owed for each embassy or diplomatic mission in London for December 2010.

London Underground Capacity (2)

  • Reference: 2011/0123
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
Please provide the total number of tube trains for each tube line and how many are needed on a week day to meet the timetable?

London Underground Capacity (1)

  • Reference: 2011/0122
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
For the months of November and December 2010, separated by lines, please list how many tube trains during peak times were not running. Please also give the reason for this, for example, lack of staff, a fault due to cracked train bracket etc.

Tube Driver delays

  • Reference: 2011/0121
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
For each month in 2010, per tube line, how many minutes have tubes been delayed due to drivers being late for their shifts?

De-icing at TfL

  • Reference: 2011/0120
  • Question by: Caroline Pidgeon
  • Meeting date: 26 January 2011
How much has London Underground spent on de-icing both on track and stations for 2008, 2009 and 2010?