Future changes to the standards

The standards for the NRMM Low Emission Zone will get tighter over time:

  • From 1 January 2025 the standards will be stage IV throughout London.
  • From 1 of January 2030 the standards will be stage V throughout London.
  • From 1 of January 2040 only zero emission machinery will be allowed.

NRMM Register

Most sites in the NRMM Low Emission Zone will be required to log all machinery (with a power rating between 37 kW and 560 kW) using the online register.

If you're a new user, you will need to create an account before you can start using the site.

If you're an existing user, you can use your account to:

  • register a new site
  • register machinery on an existing site
  • accept an invitation to register machinery at someone else’s site.

The register is also the only way site operators can get an exemption or approval to use retrofitted or specialist equipment.

Guidance for site operators

Read the NRMM practical guide, which provides detail for site operators. It includes how to find out the engine stage for each machine and tips on how to make sure your site is compliant.

Please note, the document is currently under review.                                                 

Compliance by Retrofit

If your machine does not meet the emissions standard for the site you plan to use it on, you can retrofit additional pollution control equipment as an alternative to replacing the machine or the engine.

There are a variety of retrofit systems available and some are more effective than others. To ensure the systems fitted are suitable for the NRMM Low Emission Zone, we will only accept retrofits listed on the Energy Saving Trust website.                                               

All retrofitted machines within scope (between 37kW and 560kW) require an exemption. For details on how to submit an exemption requested for retrofitted NRMM please refer to the full Exemption and Retrofit Policy below.

Exemptions

In limited circumstances we can issue exemptions for individual machines that do not meet the standards and have not been retrofitted.

Evidence must be provided when applying for an exemption. Every exemption request is considered on a case-by-case basis. 

For full details please refer to the Exemption and Retrofit Policy below. 

Helpful tips for applying for exemptions

For all NRMM exemption requests, please provide as much evidence as possible to support your application.

For generator exemption requests

If you're applying for an exemption for a Stage IIIA generator because you're unable to source a Stage V generator, please upload the following evidence:

  • A dated statement issued within the last 6 months from the supplier confirming that no Stage V solutions are available for the site and details of the supplier’s outstanding orders to demonstrate they are working towards a Stage V fleet.
  • Loading data (or equivalent) to demonstrate the power demand on site, with an explanation of any loading issues that apply.
  • Clarification on what other technologies were considered to try to overcome the loading issues, including battery options where appropriate.

We will continue to support individual site operators and construction companies so if you have any specific queries, please contact us at [email protected].

Contact us

Get in touch with the NRMM team

The information you are providing will be used only for the purpose for which you provide it. If you are selecting to receive our newsletter(s), you are providing your consent for us to process your personal data in this manner for this purpose. We will not add you to any other mailing lists unless you ask us to and we will not pass your details on to third parties. Your personal data will be handled in accordance with our privacy policy.

Need a document on this page in an accessible format?

If you use assistive technology (such as a screen reader) and need a version of a PDF or other document on this page in a more accessible format, please get in touch via our online form and tell us which format you need.

It will also help us if you tell us which assistive technology you use. We’ll consider your request and get back to you in 5 working days.