Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of

Question by 2

  • London Fire Brigade Control and Incident Command (2)

    • Reference: 2021/1126
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    How is London Fire Brigade promoting and championing joined up working between control and incident command?
  • Assurance processes

    • Reference: 2021/1127
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    The recent HMICFRS report recommended that the brigade should establish effective assurance processes in order to evidence improvement in operational practice. How are assurance processes being developed in order to meet this recommendation?
  • Response to Recent HMICFRS report

    • Reference: 2021/1128
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    What is your response to the recent HMICFRS inspection of the London Fire Brigade’s progress to implement the recommendations from the Grenfell Tower Inquiry’s Phase 1 report?
  • GTI phase 1 recommendations

    • Reference: 2021/1129
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    Is the London Fire Brigade on track to complete all of the 17 recommendations from the Grenfell Tower Inquiry’s Phase 1 report it has promised by March 2021?
  • London Fire Brigade ‘camp out’ bases

    • Reference: 2021/1130
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    What is the present policy about and availability of ‘camp out’ bases for London Fire Brigade officers who live outside London, when on call or on duty?
  • Hub for London’s Leaseholders

    • Reference: 2021/1131
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    The Fire, Resilience and Emergency Planning Committee’s report ‘Cladding crisis and its impact on Londoners’ recommended you provide a hub for London leaseholders and residents affected by cladding and fire safety issues to access legal advice and mental health support. In your response you said that the Homes for Londoners Board has called on the Government to review the role and remit of LEASE, that exists to support leaseholders with fire safety issues, and that you will continue to support leaseholders and residents impacted by the building safety crisis and lobby Government for essential change. Does this include the provision...
  • Waking Watches in London’s Boroughs

    • Reference: 2021/1132
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    Please provide a borough-by-borough breakdown of the number of buildings operating waking watches in London. Please also breakdown the numbers for buildings over 18m and under 18m in each borough.
  • Cladding Question Time for London

    • Reference: 2021/1133
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    Manchester Cladiators held a ‘Cladding Question Time’ for leaseholders with invited panellists including the Minister for Building Safety. Will you commit to organising a similar cladding question time for the thousands of London leaseholders caught up in the cladding scandal in order to bring their concerns directly to Government?
  • Grenfell Tower Inquiry [1]

    • Reference: 2021/1134
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    As the FBU reports on twitter : “At the Grenfell Tower Inquiry, The manufacturers of Grenfell's flammable insulation, Kingspan, admitted to wrongly using a failed fire test to claim their products were safe. In 2013, 'desktop assessments' were introduced to prove products were safe to be installed on high-rise properties. But these ‘desktop assessments’ aren’t proper tests. They are only assessments that determine how safe a cladding system is *if* tested. Kingspan went onto use an insulation system that had **FAILED** a fire test to produce **29** of these ‘desktop assessments’. The failed fire test was carried out by the...
  • Grenfell Tower Inquiry [2]

    • Reference: 2021/1135
    • Question by: Andrew Dismore
    • Meeting date: 18 March 2021
    Does there need to be a review into all decisions made by the Building Research Establishment (BRE) into which materials are safe or not given the scandal over approval of flammable insulation? Do you have faith in the approvals granted by the BRE, and if not do you believe it is time to re-establish a public regulator?