Whilst each junction is different, please provide the average cost for a junction review and provide the average amount of time that each review takes.

Answer

Answer for Better Junctions Review Programme (4)

Answer for Better Junctions Review Programme (4)

Answered By: 
The Mayor

While time and costs vary according to the size and complexity of each location, a feasibility study can typically take between 6 to 12 months to complete, before detailed design starts on a preferred scheme option.

Junction review costs are typically a small proportion of the overall scheme costs, assisted by TfL having built up internal design expertise. As an example, feasibility work for the recent Oval Better Junction scheme cost around £80,000 compared with an overall scheme cost of approximately £6.6m.