A41flooding

Meeting: 
MQT on 2015-10-21
Session date: 
October 21, 2015
Reference: 
2015/3528
Question By: 
Andrew Dismore
Organisation: 
Labour Group
Asked Of: 
The Mayor
Category: 

Question

On 16th September, and not for the first time, the A41 was badly flooded northbound at Brent Cross. When will you sort out the drainage of this road, so that traffic is  able to flow properly at times of heavy rain?

Answer

Answer for A41flooding

Answer for A41flooding

Answered By: 
The Mayor

TfL has a pumping station at this location which worked as planned throughout the recent heavy rainfall.  They have however contacted Thames Water relating to limited capacity of the drainage system beyond the pumps and Thames Water acknowledges capacity constraints on their network.  These could potentially be addressed by Thames Water constructing an attenuation tank, the cost of which has been estimated to be in the region of £7m and is being considered in conjunction with potential works related to the Brent Cross Redevelopment.