Do you think that a new link road will be built from the Park Royal underpass on the North Circular Road to the Old Oak Common Lane and Victoria Road crossroads, to allow HS2 and Old Oak construction traffic to avoid the congested A404 Harrow Road through Harlesden?

Answer

Answer for Old Oak Common - Quality of Infrastructure (12)

Answer for Old Oak Common - Quality of Infrastructure (12)

Answered By: 
The Mayor

TfL has carried out a Strategic Transport Study which considered the impact on the transport network of all the proposed development and infrastructure at Old Oak Common.  Within the Transport Study there is a commitment to develop a comprehensive Construction Logistics Strategy. This Strategy will aim to minimise the impacts of construction traffic on the road network and to encourage the use of rail and water transport.  HS2 Ltd is already proposing local road improvements which will provide access to their construction site. 

The Construction Logistics Strategy will take into account all the proposed developments at Old Oak Common and will consider all options for improved access including connections to the strategic road network.