Silvertown Tunnel - cost of new link roads

Meeting: 
MQT on 2014-10-22
Session date: 
October 22, 2014
Reference: 
2014/4077
Question By: 
Darren Johnson
Organisation: 
City Hall Greens
Asked Of: 
The Mayor
Category: 

Question

In your response to Q2014/1484 you outlined the measures TfL will need to take to connect the proposed Silvertown Tunnel to the existing road network. Please detail the estimated cost of carrying out these works, including any new roads or road widening.

Answer

Answer for Silvertown Tunnel - cost of new link roads

Answer for Silvertown Tunnel - cost of new link roads

Answered By: 
The Mayor

It is too early to give an estimated cost of a highway tie-in works outlined in my response to MQ 1484 /2014. The design of a highway tie-in is the subject of ongoing discussions with the borough highway authorities and a key consideration is minimising the impact on local roads, whilst providing adequate access and connectivity for local residents and businesses.  Following the outcome of these discussions, we would then be able to give a cost estimate.