Can you provide a copy of the safety audit which was carried out in advance of these changes to the junction? Did the safety audit or any other Transport for London report comment upon the 'safety' of temporarily removing advanced stop lines at this junction?

Answer

Answer for Cyclist death at Junction of Ruckholt Road and Eastway (2)

Answer for Cyclist death at Junction of Ruckholt Road and Eastway (2)

Answered By: 
The Mayor

Officers are drafting a response which will be sent shortly.

The Olympic Route Network design was divided into sections and each was subjected to full safety audit procedures. These included: preliminary design stage 1; detailed design stage 2; and post-implementation stage 3. These are included in Appendix 4. Please note that one of the Stage 2 Safety Audits was for additional measures that were not implemented and is provided for completeness.

None of these road safety audits raised a specific concern or problem regarding the temporary removal of the Advanced Stop Line on the eastbound approach of Eastway at the junction with Ruckholt Road.