Brunel Museum Rotherhithe

Meeting: 
MQT on 2007-05-23
Session date: 
May 23, 2007
Reference: 
2007/0944
Question By: 
Valerie Shawcross
Organisation: 
Labour Group
Asked Of: 
The Mayor

Question

Have you decided whether TfL will arrange for the installation of a shelf across the tunnel shaft as we discussed at the last MQT?

Answer

Answer for Brunel Museum Rotherhithe

Answer for Brunel Museum Rotherhithe

Answered By: 
The Mayor

TfL London Rail is currently undertaking a feasibility study for this proposal. This study includes a number of key considerations including: what access may be required for the pump room situated at the bottom of the shaft; what means of ventilation is required for the pump room and tunnel; any heritage considerations ; and the timing and staging of any construction within the wider construction project for the extension of the East London Line. TfL will be presenting the findings of this study to representatives from the Museum in June.