HS2 Applications

HS2 must submit applications to OPDC in connection with the new railway line and station at Old Oak Common.

HS2 Applications

Planning permission for the construction of the new high speed railway between London and the West Midlands was granted by Parliament through the High Speed Rail (London – West Midlands) Act 2017 ('the HS2 Act'). This includes a new station at Old Oak Common, which will become one of the country’s largest rail interchanges.

Although the principle of the railway line and the new station at Old Oak Common has already been agreed, High Speed 2 Limited (HS2 Ltd) must apply to the local planning authority for the approval of certain details associated with constructing and delivering the project. OPDC will determine applications for works related to development in the OPDC area, which are known as ‘Schedule 17 applications’, after Schedule 17 of the HS2 Act.

There are also other types of applications which will be determined by different authorities. For example, applications relating to noise from construction sites will be determined by Borough Councils through their environmental health function. Applications for amendments to highways will be determined by Borough Councils as the local highways authority.

Are these applications the same as planning applications?

These application are not the same, as the HS2 Act has already been granted planning permission for the project in principle. HS2 Ltd will only have to apply for the approval of certain details. The legislation only allows OPDC to consider a limited range of specific issues when determining these applications.

What details must HS2 Ltd apply to OPDC for?

The details broadly fall into four categories:

  1. Approval of detailed design
    OPDC will be required to approve plans and specifications for building works such as buildings and road and vehicle parks, fences, walls and other barriers, telecommunication masts and artificial lighting.
     
  2. Construction controls
    These applications are for construction arrangements including those relating to the handling of re-usable spoil or topsoil, road transport, storage sites for construction materials, works screening and dust suppression measures.
     
  3. Restoration of construction sites
    HS2 Ltd is required to apply for the approval of details to show how a site will be restored following its use for construction purposes.
     
  4. Bringing into use
    This category requires HS2 Ltd to apply to OPDC for confirmation that any scheduled work or depot such as the actual railway line or associated buildings may be brought into use.

What issues can OPDC consider when determining the applications?

The issues that OPDC can consider vary depending on the category of application and the precise nature of the proposal, but they are much more limited than on a normal planning application.

They can include whether the works ought to be modified to preserve the local environment or local amenity, prevent prejudicial effects on the free flow of traffic or preserve a site of archaeological or historic interest or nature conservation value.

Only the issues prescribed in the HS2 Act may be considered by OPDC when determining the application.

Where can I find more information?

  • OPDC will put up site notices to notify local residents of Schedule 17 applications. You can also sign up to our planning register and request to be notified when applications are validated
  • new applications will also be added to this page when they are validated
  • Schedule 17 of the High Speed Rail (London – West Midlands) Act 2017 sets out the details that must be applied for and the extent of the issues that OPDC can consider when determining each application
  • HS2 Ltd has set up a website to explain more about the works that will be undertaken at Old Oak
  • HS2 Ltd operate a 24-hour helpline on 020 7944 4908

Current applications

Application Reference No: 19/0175/HS2OPDC
Description of Proposal  Highway routes to be used by large goods vehicles associated with the main works stage including site investigations, preliminary mitigation works, utility works; establishment of construction compounds, site preparation and enabling works, main earthworks and structure works; construction of tunnels by tunnel boring machine; construction of ventilation shafts and headhouses; railway installation works, site restorations and, all other activities for the purposes and in connection with the scheduled and ancillary works for HS2 at five construction site compounds comprising Willesden Euro Terminal, Atlas Road, Victoria Road Cross Over Box, Victoria Road Tunnel Drive and Old Oak Common Station.
Consultation Deadline: 27 January 2020

 

Application Reference No: 20/0011/HS2OPDC
Description of Proposal  Application under Schedule 17 of the High Speed Rail (London – West Midlands) Act 2017 relating to works associated with the realignment of Old Oak Common Lane and replacement Great Western Mainline and Central Line bridges.
Consultation Deadline: 19 March 2020

 

Application Reference No: 20/0012/HS2OPDC
Description of Proposal  Application under Schedule 17 of the High Speed Rail (London – West Midlands) Act 2017 relating to above ground works associated with the new Old Oak Common station comprising main concourse, overbridges, stairs, escalators, lifts to conventional rail, conventional rail platforms and canopies, ventilation structures and associated works.
Consultation Deadline: 19 March 2020

 

Application Reference No: 20/0013/HS2OPDC
Description of Proposal  Application under Schedule 16 of the High Speed Rail (London – West Midlands) Act 2017 relating to the onsite road layout associated with the new Old Oak Common station.
Consultation Deadline: 19 March 2020

 

Application Reference No: 20/0015/HS2OPDC
Description of Proposal  Application under Schedule 16 of the High Speed Rail (London – West Midlands) Act 2017 relating to the site restoration scheme at Park Royal Garage, Atlas Road.
Consultation Deadline: 20 February 2020

 

Application Reference No: 20/0016/HS2OPDC
Description of Proposal  Application under Schedule 17 of the High Speed Rail (London – West Midlands) Act 2017 relating to permanent above ground works ancillary to the existing electricity sub-stations adjacent to Atlas Road.
Consultation Deadline: 20 February 2020

Approved applications

Application Reference No: 18/0039/HS2OPDC
Description of Proposal:

Highway routes to be used by heavy goods vehicles associated with demolition, site clearance and other enabling works for HS2 at five construction site compounds.

Compounds comprise of: Willesden Euro Terminal, Atlas Road, Victoria Road Cross Over Box, Victoria Road Tunnel Drive and Old Oak Common Station.

Consultation deadline: 5 April 2018

 

Application Reference No: 18/0198/HS2OPDC 
Description of Proposal:

Application under Schedule 17 of the High-Speed Rail (London – West Midlands) Act 2017 for approval of an electricity substation comprising 4 x transformer bays, 2 x switch houses, security fencing and internal access road.

Consultation deadline: 2 January 2019

 

Application Reference No:  18/0125/HS2OPDC 
Description of Proposal:

Application under Schedule 17 of the High-Speed Rail (London – West Midlands) Act 2017 for a non-material amendment to approval 18/0198/HS2OPDC dated 23/01/2019 for minor external amendments to the cladding colour, perimeter fencing, design and position of the doors and rainwater goods for the electricity substation.

Consultation deadline: N/A